Aged PRs: record refreshed approval for #4707
Wiki: describe the loop as it runs tonight
- Home: kit is source of truth (was backwards), R0-R30, POSTING status with
what still needs Cindy, presentation named as the product, mirror table
- Running-It: rewritten walkthrough — review -> presentation -> gate -> a new
presentation; rubric and rules as the two inputs; STEP 7's five checks; gate
artifacts; tiers; three consumers; R1g and R12c corrections
- Review-Presentation: the artifact the gates iterate on; adds USAGE, TIME and
SOLUTION-as-decisions; links the harness and evidence templates from the
visual-evidence slot
- Measurement-Harness: sync the two probe traps from the operational copy
- Aged-PRs: triage/full tiers, and the NEED test measured as a sorter
- Rulings: drop the duplicated escalation rule, reunite ruling 1's note, add
ruling 8 (divider margin)
- Calibration, Draft-Rubric-Integrated-Loop, retrospective: direction of flow,
what actually shipped, and tonight's numbers
Aged-PRs: #4083 merged as 94c2d8b; drop its Ledger row
Aged PRs: reconcile 17 stale rows with posted reviews; ledger the 16 re-reviewed
aged-PR cleanup batch 3: 9 review pages, decision-table rows, ledger
The nightly's standing quota: 18 a night, 12 incoming + 6 backlog, max 2 features
Aged-PRs: decisions table for the Step 1/Step 2 pass (68 rows, 4 closed)
Nothing aged merges unattended: decisions go in a table for Cindy to merge from
Step 3: one process for every survivor; state changes what the review accounts for, not the process
One relevance sweep over all 68; always link the PR that made it irrelevant
Be liberal closing the irrelevant and superseded — liberal about the decision, never the courtesy
Track 2: relevance first, refresh and re-review, then ledger it for the nightly
Aged-PRs: the backlog cleanup decision table