-
Notifications
You must be signed in to change notification settings - Fork 0
Release RoadMaps
yasminehilout edited this page Nov 12, 2024
·
3 revisions
This page outlines the planned tasks and goals for Release 2, including all iterations leading up to the release. Each iteration specifies tasks, assigned team members, dependencies, and completion dates.
- Configure Multi-Environment Deployment Setup – Assigned to: Xavier
- MISSING TESTS (of previous iteration)
- [REFACTORING FRONTEND (of previous iteration)]
- E2E TESTS – Backlog; Liam expressed interest in handling this
-
Create connection with Geoserver – Assigned to: Ali & Phil
- Note: Remove MapTiler integration in favor of GeoServer.
- Design the database schema for wildfire and geospatial data – Assigned to: Sam & Phil
- [Create Endpoints for Backend]
- Initialize Database and Dockerize PostgreSQL Instance – Assigned to: Louis
- Create DataPuller and connect to endpoint
- Create DataConverter for STAC Data – Assigned to: Justin (DTO)
- [BACKEND COMPONENT TASKS]
- Add toggle control for filtering datasets by region
- [REST]
- [ ] indicates tasks or issues that have not yet been created.
- Each iteration builds on previous tasks and dependencies, leading to the full completion of Release 2.
- Assignees are noted for each task to help with accountability and team coordination.