This page outlines the planned tasks and goals for Release 2, including all iterations leading up to the release. Each iteration specifies tasks, assigned team members, dependencies, and completion dates.
- [ISSUE TO FOR DIFFERENT ENVIRONMENTS] – Assigned to: Xavier
- [MISSING TESTS (of previous iteration)]
- [REFACTORING FRONTEND (of previous iteration)] – Assigned to: Yasmine
- [E2E TESTS] – Backlog; Liam expressed interest in handling this
-
Create connection with Geoserver – Assigned to: Ali & Phil
- Note: Remove MapTiler integration in favor of GeoServer.
- Design the database schema for wildfire and geospatial data – Assigned to: Sam & Phil
- [Create Endpoints for Backend]
- [Initialize Database and Dockerize PostgreSQL Instance] – Assigned to: Louis
- Create DataPuller and connect to endpoint
- Create DataConverter for STAC Data – Assigned to: Justin (DTO)
- [BACKEND COMPONENT TASKS]
- Add toggle control for filtering datasets by region
- [REST]
- [ ] indicates tasks or issues that have not yet been created.
- Each iteration builds on previous tasks and dependencies, leading to the full completion of Release 2.
- Assignees are noted for each task to help with accountability and team coordination.