Skip to content

DAOS-18777 test: combine daos_racer/multi and parallel#18191

Merged
daltonbohning merged 1 commit into
masterfrom
dbohning/daos-18777
May 11, 2026
Merged

DAOS-18777 test: combine daos_racer/multi and parallel#18191
daltonbohning merged 1 commit into
masterfrom
dbohning/daos-18777

Conversation

@daltonbohning
Copy link
Copy Markdown
Contributor

daos_racer/multi used to run for 2 hours with 1 process. daos_racer/parallel used to run for 10 minutes with 4 processes.

Update daos_racer/multi to run for 2 hours with 4 processes and delete daos_racer/parallel since it is redundant.

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

@daltonbohning daltonbohning self-assigned this May 6, 2026
@github-actions
Copy link
Copy Markdown

github-actions Bot commented May 6, 2026

Ticket title is 'ftest: combine daos_racer/multi and daos_racer/parallel'
Status is 'In Progress'
https://daosio.atlassian.net/browse/DAOS-18777

@daltonbohning daltonbohning force-pushed the dbohning/daos-18777 branch from 7bc7020 to 1da0f2b Compare May 6, 2026 18:42
@daosbuild3
Copy link
Copy Markdown
Collaborator

Test stage Functional Hardware Medium MD on SSD completed with status UNSTABLE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos//view/change-requests/job/PR-18191/2/testReport/

daos_racer/multi used to run for 2 hours with 1 process.
daos_racer/parallel used to run for 10 minutes with 4 processes.

Update daos_racer/multi to run for 2 hours with 4 processes and delete
daos_racer/parallel since it is redundant.

Test-tag: DaosRacerMultiTest
Skip-unit-tests: True
Skip-fault-injection-test: True

Signed-off-by: Dalton Bohning <dalton.bohning@hpe.com>
@daltonbohning daltonbohning force-pushed the dbohning/daos-18777 branch from 1da0f2b to ebc217c Compare May 7, 2026 14:14
@daltonbohning daltonbohning marked this pull request as ready for review May 7, 2026 20:44
@daltonbohning daltonbohning requested review from a team as code owners May 7, 2026 20:44
@daltonbohning daltonbohning requested a review from a team May 11, 2026 16:17
@daltonbohning daltonbohning added the forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. label May 11, 2026
@daltonbohning daltonbohning merged commit d6ba63a into master May 11, 2026
30 checks passed
@daltonbohning daltonbohning deleted the dbohning/daos-18777 branch May 11, 2026 16:17
daltonbohning added a commit that referenced this pull request May 12, 2026
daos_racer/multi used to run for 2 hours with 1 process.
daos_racer/parallel used to run for 10 minutes with 4 processes.

Update daos_racer/multi to run for 2 hours with 4 processes and delete
daos_racer/parallel since it is redundant.

Signed-off-by: Dalton Bohning <dalton.bohning@hpe.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed.

Development

Successfully merging this pull request may close these issues.

4 participants