Skip to content

[meta] v0.3.x → v0.4: distribution-first 6-item plan #112

@WaylandYang

Description

@WaylandYang

Tracking the post-v0.3.1 6-item plan documented in docs/ROADMAP.md. Sequence:

Total ≈ 3 months part-time. Each item is independently shippable.

Rationale

Phase 1 source-pause work shipped at 143× ceiling / 6-15× typical / 14× multi-BRANCH aggregate (RESULTS-v0.3.md). Pushing the number further past 200 ms control-plane floor is diminishing returns until real user workloads point at the next bottleneck.

Items 1-3 maximize distribution (MCP for any agent client, GitHub Action for CI flow, TS SDK for JS-side agent code). Items 4-5 close stickiness/adoption gaps with Daytona/E2B. Item 6 returns to the technical metric once 1-5 produce signal.

Track classifications

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions