This guide contains the step-by-step process to complete an EPP release.
The individual releases are tracked with endgame issues on GitHub issues.
For each release (M1, M2, M3, RC1, RC2) an endgame ticket is created with the appropriate contents from the rest of this document:
Check for bad links to Bugzilla (and other things) especially in epp.website.xml
Make sure any outstanding reviews are progressing - e.g. create progress review, get PMC approval, etc.
Annual progress review is normally done in early June
Ensure that the CI build is green. Resolving non-green builds will require tracking down problems and incompatibilities across all Eclipse participating projects. cross-project-issues-dev mailing list is a good place to start when tracking such problems.
Check that packages containing incubating projects have that information reflected in Help -> About dialog. See near the end of build output for report of check-incubating.sh script.
This item is not currently done per milestone/release because for a while now all packages contain incubating components and until TM4E moves out of incubation this step is redundant.
The incubating indication should appear in feature.properties description, plugin.xml's product aboutText and about.properties blurb.
In the past -incubation had to appear in the file name and (includes Incubating components) had to appear in packageMetaData.
See Bug 564214 for documentation/votes on decision making.
On RC1 check "new and noteworthy" version numbers - If any N&N are out of date, remove the N&N entries and notify the corresponding package maintainer.
Search for url= (notice the blank before url) in epp.website.xml to see which ones are contained in the different packages.
Remember that some of the features will release new versions together with the new Eclipse release. Therefore using the currently released version number may be wrong. Instead lookup the feature version to be released with the release train.
Synchronize the following - Remember to check branch, these links are to master, but around RC2 master may be setup for next release already
Synchronize any changes to platform.product into all the epp.product files.
Synchronize any changes to platform.p2.inf into all the *.product/p2.inf files.
Synchronize any changes to platform's icons' into icons root directory.
Update name of the release in strings with a "smart" global find&replace. Be careful on M3 that the replace did not match the Eclipse project name M2E! See this gerrit for an example. Use commit message like [releng] Prepare repo for 2020-12 M1. In particular, check:
TODO can this be automated On M1 add the M1 qualifier (e.g. 2021-03-R -> 2021-06-M1, on RC2 set it to R the qualifier e.g. 2021-03-RC1 -> 2021-03-R). Except for eclipse.simultaneous.release.name which should go from 2021-03 (4.19.0) -> 2021-06 M1 (4.20.0 M1) on M1 and 2021-03 RC1 (4.19.0 RC1) -> 2021-03 (4.19.0) on RC2
Update SIMREL_REPO in releng/org.eclipse.epp.config/parent/pom.xml if not done above.
Update the build qualifiers to ensure that packages are all updated. See this gerrit for an example. To do this run releng/org.eclipse.epp.config/tools/setGitDate (link) script. This script will make a local commit you need to push.
In some cases a respin/rebuild is needed and setGitDate needs to be run again. In that case you may need to manually add a minute or two to the applied timestamp in the script.
If the build fails there may be the opportunity to continue the build rather than restart it. This is relatively underused option but enabled by the multi-step Jenkins build in the Jenkinsfile. For example, running the build with the previously successful steps commented out can produce a build.
Disable the CI build so that the build results are not overwritten while doing the promotion. You can disable the project once it has fully started running, you don't have to wait for the build to finish.
Check that there are no warnings in the console output. Especially look for warnings about failure to sign.
If warnings about signings occur that leave the dmg unsigned and the build does not fail, please reopen Bug 567916
Run the Notarize MacOSX Downloads CI job to notarize DMG packages on download.eclipse.org. This can be done after promotion if time is tight or the notarization fails repeatedly. See Bug 571669 for an example of failures.
Check the build script output to make sure that the curl calls were successful (e.g. no curl: (92) HTTP/2 stream 0 was not closed cleanly: INTERNAL_ERROR (err 2) messages) - If there is an error like the above the .dmg file that is copied to download.eclipse.org is corrupt. Run notarize-prepare-to-redo to rename the -signed file back to -tonotarize and then re-run the notarize job
Other notes about notarization
NOTE It seems perfectly normal that the notarize job needs to be run multiple times as so many notarization attempts fail due to 500 and 000 response codes from the notarization server. See Bug 571669
NOTE Sometimes the notarization server has an error that causes a failure that requires Webmaster support. Error looks like "an existing transporter instance is currently uploading this package". To resolve request assistance in Bug 573875 (like what was done in Comment 11 of that bug). (TODO it may be possible to workaround this error by always using a different random ID when doing the notarization.)
Made sure filenames contain expected build name and milestone, e.g. 2020-03-M2
Splash screen says expected release name (with no milestone), e.g. 2020-03
Help -> About says expected build name and milestone, e.g. 2020-03-M2
org.eclipse.epp.package.* features and bundles have the timestamp of the forced qualifier update or later
Upgrade from previous release works. To test the upgrade an equivalent to the simrel release composite site needs to done. Add the following software sites to available software, check for updates and then make sure stuff works. In particular check error log and that core features (Such as JDT, Platform) have been upgraded.
https://download.eclipse.org/staging/2025-03/ - NOTE Use SIMREL_REPO if the staging repo has been updated since the SIMREL_REPO location was created.
https://download.eclipse.org/justj/epp/milestone/latest - This is needed when there is a new version of JustJ that is not also published as a release. For example, Java 21 between 2024-06 M1 and release date of 2024-06.
Verify no non-EPP content is in the p2 repo (especially justj, update remove-justj-from-p2.xml if needed)
Edit Jenkins Build Information and name it (e.g. 2020-03 M3)
Run the Promote a Build CI job to prepare build artifacts and copy them to download.eclipse.org
Optional - useful when testing changes to the promotion scripts: Run the build once in DRY_RUN mode to ensure that the output is correct before it is copied to download.eclipse.org.
This used to be done done late in the day to try and reduce impact of adding dozens of GB on the download server and having all the mirrors start to pick it up right away. See epp-dev emails that led to this decision. However in 2024 the impact seems to no longer be a concern. This note is preserved until we know for sure there is no issue.
The DRY_RUN can be done earlier in the day and is a good way to increase the chance that the final promotion step will be successful.
Run the Notarize MacOSX Downloads CI job to notarize DMG packages on download.eclipse.org if the promoted build was unstable
Update SIMREL_REPO to the staging repo so CI builds run against CI of SimRel (e.g. see this gerrit)
Send email to epp-dev to request package maintainers test it. The email is templated in email.txt in the release directory.
NOTE For R build the release is initially published to a temporary location and then moved to the R directory later. Make a note in the email where the temporary location is.
Archive old milestones/RCs so that they don't accumulate on the mirrors
On all milestone/release days
This applies to all releases, i.e. M1, M2, M3, RC1 and R. Everything except R is typically the Friday around 9:30am Ottawa time and the R is the following Wednesday sometime before 10am in coordination with the SimRel release engineer.
Optional - useful when testing changes to the promotion scripts: Run the build once in DRY_RUN mode to ensure that the output is correct before it applies changes to download.eclipse.org.
Send an updated email to epp-dev informing that the provisional URL has been renamed to R.
On Final release day
These jobs should be completed by approximately 10am Ottawa time on release days.
Run the Finalize Release CI job to create the "next" release and updated the "latest" release as follows:
The next release sub-directory needs to be created immediately, i.e. when 2019-12 was released, a directory 2020-03 had been created with an empty p2 composite repository pointing to 2019-12 until M1. On M1 release day this changes to a composite p2 repository with M1 content.
Optional - useful when testing changes to the promotion scripts: Run the build once in DRY_RUN mode to ensure that the output is correct before it applies changes to download.eclipse.org.
The EPP Release Process
This guide contains the step-by-step process to complete an EPP release.
The individual releases are tracked with endgame issues on GitHub issues.
For each release (M1, M2, M3, RC1, RC2) an endgame ticket is created with the appropriate contents from the rest of this document:
EPP releases happen for each milestone and release candidate according to the Eclipse Simultaneous Release Plan.
Steps for all Milestones and RCs:
Check for bad links to Bugzilla (and other things) especially in
epp.website.xmlMake sure any outstanding reviews are progressing - e.g. create progress review, get PMC approval, etc.
Ensure that the CI build is green. Resolving non-green builds will require tracking down problems and incompatibilities across all Eclipse participating projects. cross-project-issues-dev mailing list is a good place to start when tracking such problems.
Check that packages containing incubating projects have that information reflected in Help -> About dialog. See near the end of build output for report of check-incubating.sh script.
description, plugin.xml's productaboutTextand about.propertiesblurb.In the past
-incubationhad to appear in the file name and(includes Incubating components)had to appear inpackageMetaData.See Bug 564214 for documentation/votes on decision making.
On RC1 check "new and noteworthy" version numbers - If any N&N are out of date, remove the N&N entries and notify the corresponding package maintainer.
url=(notice the blank before url) inepp.website.xmlto see which ones are contained in the different packages.Synchronize the following - Remember to check branch, these links are to master, but around RC2 master may be setup for next release already
epp.productfiles.*.product/p2.inffiles.iconsroot directory.Update name of the release in strings with a "smart" global find&replace. Be careful on M3 that the replace did not match the Eclipse project name M2E! See this gerrit for an example. Use commit message like
[releng] Prepare repo for 2020-12 M1. In particular, check:2021-03-R->2021-06-M1, on RC2 set it toRthe qualifier e.g.2021-03-RC1->2021-03-R). Except foreclipse.simultaneous.release.namewhich should go from2021-03 (4.19.0)->2021-06 M1 (4.20.0 M1)on M1 and2021-03 RC1 (4.19.0 RC1)->2021-03 (4.19.0)on RC2packages/*/epp.website.xmlforproduct name=lineRELEASE_NAME,PREV_RELEASE_NAME,NEXT_RELEASE_NAME,RELEASE_MILESTONE,RELEASE_DIR,SIMREL_REPO, Variables in parent pomreleng/org.eclipse.epp.config/parent/pom.xmlSIMREL_REPOshould be updated to the URL published in the email to cross-project-issues announcing SimRel repo is ready for EPP buildeclipse.simultaneous.release.nameeclipse.simultaneous.release.nameremove qualifier i.e. it should be2020-12 (4.18.0)eclipse.simultaneous.release.nameremove qualifier i.e. it should be2020-12 M1 (4.18.0 M1)Update the Last Recorded +1 in the email template which any package and platform +1s that have been received since the last update.
Wait for announcement that the staging repo is ready on cross-project-issues-dev. An example announcement.
SIMREL_REPOinreleng/org.eclipse.epp.config/parent/pom.xmlif not done above.Update the build qualifiers to ensure that packages are all updated. See this gerrit for an example. To do this run
releng/org.eclipse.epp.config/tools/setGitDate(link) script. This script will make a local commit you need to push.Run a CI build that includes the above changes.
Disable the CI build so that the build results are not overwritten while doing the promotion. You can disable the project once it has fully started running, you don't have to wait for the build to finish.
Check that there are no warnings in the console output. Especially look for warnings about failure to sign.
Run the Notarize MacOSX Downloads CI job to notarize DMG packages on download.eclipse.org. This can be done after promotion if time is tight or the notarization fails repeatedly. See Bug 571669 for an example of failures.
Check the build script output to make sure that the curl calls were successful (e.g. no
curl: (92) HTTP/2 stream 0 was not closed cleanly: INTERNAL_ERROR (err 2)messages) - If there is an error like the above the .dmg file that is copied to download.eclipse.org is corrupt. Run notarize-prepare-to-redo to rename the -signed file back to -tonotarize and then re-run the notarize jobOther notes about notarization
Sanity check the build for the following:
2020-03-M22020-032020-03-M2org.eclipse.epp.package.*features and bundles have the timestamp of the forced qualifier update or laterhttps://download.eclipse.org/staging/2025-03/- NOTE UseSIMREL_REPOif the staging repo has been updated since theSIMREL_REPOlocation was created.https://download.eclipse.org/technology/epp/staging/repository/https://download.eclipse.org/justj/epp/milestone/latest- This is needed when there is a new version of JustJ that is not also published as a release. For example, Java 21 between 2024-06 M1 and release date of 2024-06.Edit the Jenkins build
2020-03 M3)Run the Promote a Build CI job to prepare build artifacts and copy them to download.eclipse.org
DRY_RUNmode to ensure that the output is correct before it is copied to download.eclipse.org.DRY_RUNcan be done earlier in the day and is a good way to increase the chance that the final promotion step will be successful.Run the Notarize MacOSX Downloads CI job to notarize DMG packages on download.eclipse.org if the promoted build was unstable
Update
SIMREL_REPOto the staging repo so CI builds run against CI of SimRel (e.g. see this gerrit)Re-enable the CI build
Send email to epp-dev to request package maintainers test it. The email is templated in email.txt in the release directory.
Rbuild the release is initially published to a temporary location and then moved to theRdirectory later. Make a note in the email where the temporary location is.Archive old milestones/RCs so that they don't accumulate on the mirrors
On all milestone/release days
This applies to all releases, i.e. M1, M2, M3, RC1 and R. Everything except R is typically the Friday around 9:30am Ottawa time and the R is the following Wednesday sometime before 10am in coordination with the SimRel release engineer.
24-48 Hours Before Final release day
git tag --annotate 2020-03_R -m"2020-03 Release" 1b7a1c1af156e3ac57768b87be258cd22b49456bDRY_RUNmode to ensure that the output is correct before it applies changes to download.eclipse.org.R.On Final release day
These jobs should be completed by approximately 10am Ottawa time on release days.
DRY_RUNmode to ensure that the output is correct before it applies changes to download.eclipse.org.