-
Notifications
You must be signed in to change notification settings - Fork 74
Open
Description
Important
Make sure to link this issue with the PR for your improvement.
Deviation_13: The method selection for the unit tests seems to be too theoretical or wrong. How is a control flow and data flow analysis made on Unit level? Why is requirements based testing and interface based testing not selected? The table should be reworked in accordance to the mapping of the specified test levels to the ISO 26262 test levels.
Action_43: The mapping of the test levels to the ISO 26262-6 test levels shall be shown e.g., in the PMP.
Action_44: Provide an argumentation about which tests have been selected for a feature.
Metadata
Metadata
Assignees
Type
Projects
Status
No status
Status
In progress
Status
In Progress