Week 4 focuses on finalizing deliverables, verifying CI/Docker workflows, and preparing for the final merge to main.
Completed / In Progress Activities
- Wiki documentation for Week 4 is being prepared (meeting notes, decision log updates, progress report).
- CI workflows are expected to remain green on develop and all PRs.
- Docker images and tags will be verified on Docker Hub (planned).
Task Ownership
- Ahmet Murat Sencay: Wiki completion + reporting
- Mert Ali Mirzanlı: Docker/CI final checks + preparation for final merge
- Muhammet Ertuğrul Özcan: Final application fixes if required by test/CI results
Expected Deliverables (Week 4)
- Week 4 wiki pages completed
- Verified Docker images/tags on Docker Hub
- Final merge to main (end of Week 4)
- Release tag created after final merge to main (end of Week 4)
Next Steps
- Wait for Student 2 and Student 3 to finish Week 4 technical tasks.
- Review/merge PRs into develop.
- Perform final merge to main and create release tag at the end of Week 4.
Final Verification (Completed):
- Docker Compose was executed end-to-end using the final Docker Hub images.
-
sis_dbcontainer reached healthy status successfully. -
sis_appcontainer started correctly and connected to the database. - CRUD operations (add, list, update, delete student) were manually tested inside the running container.
- CI workflows passed successfully on develop branch after final PR merges.