Week 4 Progress Report

ahmet murat sencay edited this page Jan 9, 2026 · 2 revisions

Week 4 focuses on finalizing deliverables, verifying CI/Docker workflows, and preparing for the final merge to main.

Completed / In Progress Activities

  • Wiki documentation for Week 4 is being prepared (meeting notes, decision log updates, progress report).
  • CI workflows are expected to remain green on develop and all PRs.
  • Docker images and tags will be verified on Docker Hub (planned).

Task Ownership

  • Ahmet Murat Sencay: Wiki completion + reporting
  • Mert Ali Mirzanlı: Docker/CI final checks + preparation for final merge
  • Muhammet Ertuğrul Özcan: Final application fixes if required by test/CI results

Expected Deliverables (Week 4)

  • Week 4 wiki pages completed
  • Verified Docker images/tags on Docker Hub
  • Final merge to main (end of Week 4)
  • Release tag created after final merge to main (end of Week 4)

Next Steps

  • Wait for Student 2 and Student 3 to finish Week 4 technical tasks.
  • Review/merge PRs into develop.
  • Perform final merge to main and create release tag at the end of Week 4.

Final Verification (Completed):

  • Docker Compose was executed end-to-end using the final Docker Hub images.
  • sis_db container reached healthy status successfully.
  • sis_app container started correctly and connected to the database.
  • CRUD operations (add, list, update, delete student) were manually tested inside the running container.
  • CI workflows passed successfully on develop branch after final PR merges.