Clarify planning surfaces and retire stale milestone machinery #299

@flyingrobots

Description

@flyingrobots

Summary

Inventory and reconcile the repository's planning surfaces after the product clarification work.

Why

The repo currently has multiple competing control planes:

  • open GitHub milestones that are all 100% complete relics
  • open issues from older milestone eras (for example IRONCLAD / M9)
  • local planning artifacts and docs that still encode the old platform/bridge roadmap
  • newly rewritten product docs that frame git-mind as inference-first semantic repository intelligence

We need one coherent operating model.

Scope

  • triage open GitHub issues against the new product frame
  • close or retire stale GitHub milestones
  • identify local manual tracking artifacts that should be aligned, archived, or demoted to historical notes
  • decide whether backlog should be managed primarily via IBM Hills + Playbacks rather than GitHub milestones
  • update design docs with the resulting operating model

Exit Criteria

  • one recommended backlog operating model
  • stale milestone machinery identified and retired or explicitly quarantined
  • misaligned tracking/docs called out and reconciled
  • product-facing docs no longer compete with historical planning surfaces

Metadata

Metadata

Assignees

No one assigned

    Labels

    lane:foundationSupporting lane — core hardening, contracts, integrity

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions