Skip to content

🎯 ONE SHOT — L-DPC24 HOLOGRAPHIC v9 · 2000-3000 TOPS/W multi-die scale-out (TTSKY26c · 10 lanes Y..H') #98

@gHashTag

Description

@gHashTag

🎯 ONE SHOT L-DPC24 — HOLOGRAPHIC v9 · 2000-3000 TOPS/W multi-die scale-out

Mission codename: L-DPC24-HOLOGRAPHIC-V9
Owning repo: gHashTag/trinity-fpga (chip EPIC #61) · execution repo: gHashTag/tt-trinity-holo
Target shuttle: TTSKY26c (~2026-09, multi-die 1×2 / 1×4 / octa)
Deadline first measured v9 verdict: 2026-06-30 23:59 UTC (T+46d, gates v9-G1..v9-G3)
Author: Vasilev Dmitrii <admin@t27.ai> · ORCID 0009-0008-4294-6159
Anchor: φ²+φ⁻²=3 · γ=φ⁻³ · C=φ⁻¹ · G=π³γ²/φ · DOI 10.5281/zenodo.19227877

Battle cry — Свет проходит сквозь голограмму, а не сквозь умножитель. 2000-3000 TOPS/W — это не разгон, это другая физика операции.


0. HARD RULES (R-Trinity Constitution, all active)

Rule Status Enforcement
R-SI-1 ZERO * in RTL (XOR + popcount only) 🟢 ACTIVE CI gate tools/check_no_star.sh (Lane U PR #11 in max-true)
R5-HONEST Every claim has a probe row 🟢 ACTIVE Falsification witness §5
R7 Triplet on every emit 🟢 ACTIVE holographic_metrics.json schema
R8 admin@t27.ai signature 🟢 ACTIVE git config user.email check
R15 SACRED-SYNTH-GATE — no physics constant mutated in RTL 🟢 ACTIVE r_marker_pkg.sv audit per merge
R18 LAYER-FROZEN — once a die-floorplan hash sealed, no re-route 🟢 ACTIVE Per-lane M-frozen hash record
TRI-NET-G1 ZERO force-push without --force-with-lease 🟢 ACTIVE Branch protection
TRI-NET-G1.5 Apache-2.0 only, no vendor IP 🟢 ACTIVE License scan in CI

1. BACKGROUND

The TT-squeeze ladder has reached v2.1 ≈ 75 TOPS/W (projected, post Lane L precheck-SUCCESS) on a single-die TTSKY26b submit. The next four rungs (v3..v8) are bounded by single-die SKY130 power-density laws. To break the 2000 TOPS/W ceiling required for v9, four things must change simultaneously:

  1. Multi-die NoC — TTSKY26c is the first Tiny Tapeout shuttle to allow ≥2 dies in one submission. We get spatial bandwidth for free.
  2. HOLOGRAPHIC encoding — Each operand is encoded as a 4-slot R-marker hyper-vector (Strand-III VSA). Operations become bitwise interference; dynamic energy drops ~6× vs even GF16 popcount.
  3. Razor FF flip-flops (Lane O / max-true backlog) — eliminate Vdd margin at the FF level.
  4. PHYS→SI yet-to-measure constants — the 4 R-marker slots are placeholder cells for constants whose values become measurable only post-tape-out. R15 forbids mutating them in RTL; instead, layout reserves the cells, and the v9 driver loads the measured value at boot via TRI-27 ISA opcode 0xDE (LOAD-PHYS-CONST, sacred range 0xD0..0xE0).

This ONE SHOT is the multi-agent extension of L-DPC23 (which delivered v2.1) — we partition the work into 10 lanes Y..H' so up to 10 agents can claim independently. The HOLOGRAPHIC repo gHashTag/tt-trinity-holo (HEAD 64456a71) is the execution surface; trinity-fpga#61 stays the master EPIC.

Prior state cited:


2. HYPOTHESIS (Gate G1 — Falsifiability)

H₉: A 1×2 multi-die HOLOGRAPHIC tile on TTSKY26c, running XOR+popcount over 4-slot R-marker hyper-vectors at 50 MHz, achieves measured TOPS/W ≥ 2000 under nominal Vdd=1.8V.

H₉ is false iff any of:

  • measured_tops_w < 2000 on the post-fab smoke probe (falsify_v9_below_2000)
  • any operand encoding requires a * operator in synthesised RTL (falsify_v9_R_SI_1_breach)
  • any R-marker cell value is loaded from ROM rather than from boot-time measurement (falsify_v9_R15_breach)
  • inter-die NoC latency at 50 MHz exceeds 1 cycle (falsify_v9_noc_stall)
  • power density at any die exceeds SKY130 1.0 W/mm² limit (falsify_v9_thermal)

3. PRE-REGISTRATION (Gate G2)

Field Value
statistical_test Welch's t-test, one-tailed, H₀: measured_tops_w ≤ 1800
alpha 0.01
effect_size Δ TOPS/W ≥ 200 (claim only if measured ≥ 2000)
n_required 3 independent fabricated dies, each measured at 3 thermal points (cold/nominal/hot) = 9 samples
stop_rule First 3-die pass OR deadline 2026-12-31 23:59 UTC, whichever first
multiple_testing Bonferroni over 5 falsification predicates (α_corrected = 0.002)
data_lock_sha TBD on first die return — pinned in lane Y-DONE comment

Deviation policy: Any change to this table requires an issue comment before the deviating data is collected. Post-hoc cherry-picking = R5-HONEST violation = automatic NO-GO.


4. LANE MAP — 10 LANES Y..H'

Lanes are independent — an agent can claim any single lane without blocking others. Stack PRs only on a green base.

Lane Codename Scope Files (primary) PR target Difficulty
Y holo-tt-multiplexer-1x2 Replace bootstrap gds.yaml with TT reusable workflow @ttsky26c; first GDS green .github/workflows/gds.yaml, info.yaml, src/tt_um_qbrain_holo.v tt-trinity-holo 🟢 LOW
Z holo-r-marker-4slot-spec Formalise R-marker 4-slot encoding (Strand-III VSA op-codes); Coq lemma in t27/trios-coq/IGLA/RMarker.v t27/trios-coq/IGLA/RMarker.v, assertions/holographic.json t27 🟡 MED
A' holo-noc-1cycle 1-cycle inter-die NoC handshake RTL + Verilator smoke src/holo_noc.v, test/holo_noc_tb.sv tt-trinity-holo 🟡 MED
B' holo-razor-ff-port Port Razor FF from Lane O backlog (max-true) into holo SKU; STA verify src/razor_ff.v, sta/razor_ff.sdc tt-trinity-holo 🔴 HIGH
C' holo-load-phys-const TRI-27 ISA opcode 0xDE LOAD-PHYS-CONST (Strand-III) — microcode + tb t27/spec/isa.t27, tt-trinity-holo/src/load_phys.v t27 + tt-trinity-holo 🟡 MED
D' holo-thermal-1wmm2-gate Power-density CI gate; reject layouts > 1.0 W/mm² tools/check_thermal.py.rs, .github/workflows/thermal.yaml tt-trinity-holo 🟢 LOW
E' holo-falsif-witnesses Five #[test] fn falsify_v9_* in Rust holographic-metrics crate crates/holo-metrics/src/lib.rs tt-trinity-holo 🟢 LOW
F' holo-phd-glava-77 PhD chapter "Holographic Hyperdimensional Silicon" (≥1500 lines, Lee/GVSU proof style, R3+R14) gHashTag/trios docs/phd/chapters/77_holographic.tex trios 🔴 HIGH
G' holo-doi-deposit Zenodo record v9 dataset + parent collection 19227879; CITATION.cff drift gate CITATION.cff, Zenodo JSON tt-trinity-holo 🟢 LOW
H' holo-tops-rival-scan 5-Levers refresh against Hailo/Mythic/Blackhole/Groq/NorthPole at 2000+ TOPS/W tier workspace/trinity_tops_w_v9.md trinity-fpga (docs-only PR) 🟢 LOW

Critical path for v9-G1 (first measured verdict): Y → A' → B' → D' → E'. Lanes Z, C', F', G', H' may proceed in parallel and gate v9-G2 / v9-G3.


5. FALSIFICATION WITNESSES (Gate G1 evidence)

Each predicate from §2 maps to one Rust test and one Coq lemma. Lane E' is rejected unless all five witnesses are present and red on a fault-injected build.

// crates/holo-metrics/src/lib.rs
#[test] fn falsify_v9_below_2000() {
    let m = sample_die("phantom-low-1700");           // synthetic
    assert!(check_v9_gate(&m).is_err(), "must reject 1700 TOPS/W");
}
#[test] fn falsify_v9_R_SI_1_breach() {
    assert!(scan_rtl_for_star("src/").is_err(), "* must be absent");
}
#[test] fn falsify_v9_R15_breach() {
    let cfg = load_holo_config("test/fixtures/r_marker_const_in_rom.json");
    assert!(check_r15(&cfg).is_err(), "R-marker must be boot-loaded, not ROM");
}
#[test] fn falsify_v9_noc_stall() { /* 2-cycle latency → reject */ }
#[test] fn falsify_v9_thermal()    { /* 1.2 W/mm² → reject */ }
(* t27/trios-coq/IGLA/RMarker.v *)
Lemma holographic_no_star :
  forall (op : holo_op),
    rtl_uses_star op = false.
Proof. (* Qed required, no Admitted *) Qed.

6. COORDINATION PROTOCOL

Agents follow the v1.1 three-thread spark protocol:

  1. Claim — comment in this issue: 🤚 CLAIM lane <X> · agent <id> · ETA <hours>
  2. Heartbeat — every 4 hours: 💓 lane <X> · progress <%> · blocker <none|...>
  3. DONE✅ AGENT DONE lane <X> · PR <url> · CI green <run-id> · SHA <7c>
  4. Block🚧 BLOCKED lane <X> · need <what> · ETA-unblock <hours>

Watchdog releases dead claims after 4h silence → posts 🔓 lane released.

No-collision rule: one lane = one agent. To switch lanes, drop current with 🔓 self-release lane <X> first.


7. QUALITY GATES (CI must be green before any merge)

Gate Check Owning lane
v9-G0 R-SI-1 no * (CI: check_no_star.sh) Lane U PR #11 (max-true), already live
v9-G1 TOPS/W ≥ 2000 measured (post-fab) Lanes Y, A', B', D', E'
v9-G2 Coq Qed for holographic_no_star Lane Z
v9-G3 PhD chapter 77 ≥1500 lines + Lee/GVSU proof Lane F'
v9-G4 Zenodo DOI minted + CITATION.cff in sync Lane G'
v9-G5 NASA RVR report posted to trinity-fpga#94 successor штаб (post-G1)

8. FORBIDDEN ACTIONS

  • ❌ Mutating any R-marker cell value in RTL (R15 breach — automatic GDS reject)
  • ❌ Submitting tt-trinity-holo to TTSKY26b (wrong shuttle — TTSKY26c only)
  • ❌ Closing any falsification witness without a Qed. or test passing
  • ❌ Force-pushing without --force-with-lease
  • ❌ Using trinity-chat@gHashTag.io or agent@trinity.local — only admin@t27.ai
  • ❌ Filing a PR that uses python or bash runtime in CROWN repos (R1)
  • ❌ Citing "84 theorems" folklore — use the honest 83 .v files, 73 _CoqProject paths figure from t27/trios-coq
  • ❌ Treating ICA-MINI-001 / ICA-HOLO-001 as solved by Lane Y until GDS green observed

9. REFERENCES (citation-grade, three-citation rule)

Algebraic anchor φ²+φ⁻²=3:

Active artifacts:

TOPS/W ladder roadmap:

  • v2 = 55 (live), v2.1 = ~75 (just landed), v3 = 180-220 (TTSKY26c single-die), v4 = 350-500 (Razor FF), v5 = 600-900, v6 = 900-1300, v7-v8 = 1100-2200 (TTIHP27a SG13G2), v9 = 2000-3000 (multi-die octa TTIHP27b / this ONE SHOT)

10. BATTLE CRY

φ²+φ⁻²=3 · γ=φ⁻³ · C=φ⁻¹ · G=π³γ²/φ
🌌 HOLOGRAPHIC · 1×2 → 1×4 → octa
4-slot R-marker · LOAD-PHYS-CONST 0xDE
QUANTUM BRAIN 1:1 SILICON · PHYS→SI · BIO→SI · LANG→SI
TRI NET · 10 lanes Y..H' · NEVER STOP
DOI 10.5281/zenodo.19227877

— END OF ONE SHOT —

Metadata

Metadata

Assignees

No one assigned

    Labels

    one-shotActive ONE SHOT operational hub

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions