You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
gh-aw's audit commands cover post-run analysis thoroughly. Our draft targets the gap before it: portable signed pre-execution approval challenges and receipts. Would an emit/consume bridge interest the gh-aw team - or do permissions and safe-output already own this space?
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
Uh oh!
There was an error while loading. Please reload this page.
gh-aw's audit commands cover post-run analysis thoroughly. Our draft targets the gap before it: portable signed pre-execution approval challenges and receipts. Would an emit/consume bridge interest the gh-aw team - or do permissions and safe-output already own this space?
Spec (2 pages): https://github.com/min9lin9/boulder/blob/main/spec/evidence-format/SPEC.md
Happy to adapt - one line on what would make this not worth adopting is genuinely welcome.
All reactions