Skip to content

chore(docs): delete Phase 6 plan file#217

Merged
cbeaulieu-gt merged 1 commit intomainfrom
cleanup/phase-6-plan-file
May 6, 2026
Merged

chore(docs): delete Phase 6 plan file#217
cbeaulieu-gt merged 1 commit intomainfrom
cleanup/phase-6-plan-file

Conversation

@cbeaulieu-gt
Copy link
Copy Markdown
Member

Summary

Per the CLAUDE.md plan-file lifecycle rule, plan files are deleted once their parent epic is closed — not archived, not ticked-through, just removed. The Phase 6 promotion epic (#144) was closed by the merge of PR #209, so this is bookkeeping.

No issues are closed by this PR. #144 is already closed; this change has no functional effect on any open tracking item.

Where the durable information now lives

All content worth preserving was extracted before deletion:

  1. PR Phase 6: promote/rollback automation, freshness alarm, prune (#144) #209 body — extended on 2026-05-06 with the "Task 6.9 Rehearsal — Outcome" section (148 lines): rehearsal sequence table, deliberate-failure result, risk reassessment, and findings list.
  2. Issue runtime-rollback.yml Step 6.3.5b passes image URL to inventory-match.sh — needs enumerate-persona.sh extraction first #213 — the rollback inventory-match defect surfaced during rehearsal; closed by PR fix(rollback): enumerate persona before inventory-match #214.
  3. agent-memory/general-purpose/feedback_stage5_only_rollback_targets.md — the STAGE-5-only rollback target rule distilled from the rehearsal findings.

Pre-flight: inbound reference check

Before deleting, git grep was run across the entire repo excluding docs/superpowers/plans/ for any reference to phase-6-promotion.md. Exit code 1 — no matches. No dangling references to redirect.

🤖 Generated by Claude Code on behalf of @cbeaulieu-gt

Per CLAUDE.md plan-file lifecycle, plan files are deleted once their
parent epic is closed. #144 was closed by the merge of PR #209. Durable
information from this plan now lives in the PR #209 body (rehearsal
outcome section), closed issue #213 (rollback inventory-match defect),
and agent-memory/general-purpose/feedback_stage5_only_rollback_targets.md.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
@github-actions
Copy link
Copy Markdown

github-actions Bot commented May 6, 2026

Claude Code is working…

I'll analyze this and get back to you.

View job run

@github-actions
Copy link
Copy Markdown

github-actions Bot commented May 6, 2026

⚠️ Automated PR review incomplete

Claude hit the turn limit before finishing this review. The PR may be too large or complex for the current settings.

What happened: The review was cut off at 30 turns (PR has 1 files changed).

Options:

  • Re-run the workflow with a higher max_turns input
  • Break the PR into smaller, focused pieces
  • Trigger a manual review with @claude review this PR

@cbeaulieu-gt cbeaulieu-gt merged commit 2a3c23c into main May 6, 2026
2 of 3 checks passed
@cbeaulieu-gt cbeaulieu-gt deleted the cleanup/phase-6-plan-file branch May 6, 2026 21:36
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant