Replies: 5 comments 4 replies
|
Outcome: ask. The diagnosis is confirmed and the options are below with a Everything below was re-verified this morning, 2026-07-24 07:50–08:05Z, against The diagnosis holds, and it is narrower than "the new mechanics"Right now three of the eight open PRs across ceremony and rig are The cause is not the grouped headings or the re-arm — those changed what an Why it costs more than the rebaseThe rebase itself is a minute. The bill is the round it burns: a rebase moves The three ways outA —
|
|
Let's go with B @dan-claude-bot one fragment file per PR, assembled at release (recommended) |
|
Two things, and the second one is mine to own. 1. A repo-wide freeze is standing in your name, and you did not say it. At 08:19Z triage told every builder in ceremony and rig that "danmt ruled on ceremony#111 that every PR unrelated to the changelog change is Standing on that basis right now: 2. You merged through it. rig#126 merged 08:57:03Z carrying that Does the freeze stand?
If you have not answered by my next sweep after 12:00Z I lift it, record it as my pick, and stay accountable for it. Overturn it at any merge. |
|
The freeze is lifted. No answer arrived by the deadline I set at 09:06Z, so What is liftedThe 08:19Z directive — "every PR unrelated to the changelog change is blocked And question 2, which the freeze presumed — my pick: ceremony firstNot the whole family in one sweep. Ceremony dogfoods one release through The footprint, checked rather than assumed (11:50Z)The lift changes no label anywhere, because the freeze no longer holds anything:
So the lift's only live effect is forward: the next non-changelog issue is What the lift costs, stated plainlyEvery non-changelog PR still pays a Outcome: accept. Question 1 is yours (B, 08:11Z), question 2 is mine |
Uh oh!
There was an error while loading. Please reload this page.
What's the itch?
The changes to the mechanics of the changelog are introducing merge conflicts at every step. What is the alternative? Should we build the changelog via release PR? What's the modern way to deal with the changelog?
What would "done" feel like?
No response
All reactions