Skip to content

docs: Phase 0 closure record (CHANGELOG + maintenance report + wiki + STATE.a2ml) — session-close pass#64

Merged
hyperpolymath merged 2 commits into
mainfrom
chore/session-close-docs
May 26, 2026
Merged

docs: Phase 0 closure record (CHANGELOG + maintenance report + wiki + STATE.a2ml) — session-close pass#64
hyperpolymath merged 2 commits into
mainfrom
chore/session-close-docs

Conversation

@hyperpolymath
Copy link
Copy Markdown
Owner

Summary

Final documentation pass for the 2026-05-24/25 Phase 0 closure work. Records the same outcome at three levels of formality for three audiences.

Files

Audience File What
Humans / changelog readers CHANGELOG.md New [Unreleased] §"Phase 0 closure pass" listing all 11 PRs + aggregate numbers
Humans / archival reader six months later docs/reports/maintenance/2026-05-25-phase-0-closure.adoc (new) Canonical written record: summary, per-PR table, before/after numbers, outstanding work, process notes / lessons
Wiki / outside readers docs/wiki/Phase-0-Status.md Headline updated to 2026-05-25 + gates state; added headline-numbers block; #63 moves from "in flight" to "shipped"
Machines / agents / dashboards .machine_readable/6a2/STATE.a2ml last-updated bumped; session line refreshed (7 PRs → 11); milestones[] expanded with tree-sitter v1, full-EBNF parity, RSR taxonomy, wiki source-of-truth, parser-migration progress

No code changes.

Verification

Aspect tests all green:

  • claim-envelope: 57 passed, 0 failed
  • security-envelope: 10 passed, 0 failed
  • proof-regression: 25 passed, 0 failed, 1 skipped (idris2 not on PATH)

After this lands

This is the session-close documentation pass. With this PR merged, it is safe to close this session. Phase 0 outstanding work (Idris2 parser + codegen v0 + Track B cross-repo) is the next-session / multi-week handoff. The next session can resume with a clean ledger by reading docs/reports/maintenance/2026-05-25-phase-0-closure.adoc + the live state in issue #48.

Test plan


Generated by Claude Code

Final documentation pass for the 2026-05-24/25 Phase 0 closure work.
Records the same outcome at three levels of formality for three
audiences:

HUMANS:
- CHANGELOG.md gets an [Unreleased] §"Phase 0 closure pass" section
  listing all 11 PRs with what each one did, plus aggregate numbers
  (545+ test assertions across 11 surfaces, up from ~430).
- docs/reports/maintenance/2026-05-25-phase-0-closure.adoc is the
  canonical written record: summary, per-PR table, before/after
  numbers, what's outstanding, process notes / lessons. A reader
  six months from now can reconstruct what happened and why from
  this single document.

WIKI (outside readers):
- docs/wiki/Phase-0-Status.md headline updated from "as of 2026-05-24"
  to "as of 2026-05-25; Gates 1 + 3 met; gate 2 remains". Added
  headline-numbers block (11 PRs, 545+ assertions, 2 of 3 gates).
  The Track Docs row for #63 moves from "in flight" to "shipped".

MACHINES:
- .machine_readable/6a2/STATE.a2ml: last-updated 2026-05-24 ->
  2026-05-25; session line updated to list all 11 PRs (was 7);
  milestones[] expanded: tree-sitter scaffold 20% -> 100% (PR #58);
  tree-sitter v1 100% (new, PR #62); tree-sitter full-EBNF parity
  ~35% (new milestone); RSR taxonomy 100% (new, PR #63); wiki
  source-of-truth 100% (new, PR #61); parser migration
  ReScript -> AffineScript -> Idris2 at 50% (new). last-run-utc
  bumped.

No code changes. Aspect tests still green: claim-envelope 57/0,
security-envelope 10/0, proof-regression 25/0/1skip.

This is the session-close documentation pass. Phase 0 outstanding
work (Idris2 parser + codegen v0 + Track B cross-repo) is the
next-session / multi-week handoff.
@hyperpolymath hyperpolymath enabled auto-merge May 26, 2026 00:24
…ation

Two final stale ReScript references in machine-readable manifests
that were missed in PR #63's human-facing scrub:

- .machine_readable/6a2/ECOSYSTEM.a2ml integration-points entry
  "ReScript parser toolchain / rescript build" -> "AffineScript parser
  toolchain / affinescript build" with a pointer to the 2026-05-25
  migration date for archaeology
- .machine_readable/6a2/META.a2ml languages list:
  "rescript" -> "affinescript"

Remaining ReScript references in .machine_readable/{ai,policies,
contractiles}/* + ENSAID_CONFIG.a2ml are template / cross-cutting
governance configs out of scope here.

Phase issues #49-#54 also updated via MCP issue_write — replaced
"#TODO link Phase 0 issue" placeholders with real predecessor +
successor cross-references plus relevant additional context (D2
decision link for #51; tree-sitter status for #52). Each phase
issue now has a clear "next phase" pointer at the bottom.

No code changes.
@hyperpolymath hyperpolymath merged commit 03a37a6 into main May 26, 2026
28 checks passed
@hyperpolymath hyperpolymath deleted the chore/session-close-docs branch May 26, 2026 11:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants