Model Context Protocol (MCP) server that exposes project schedules β Microsoft Project, Primavera P6 and Synchro Scheduler β to LLM clients like Claude Desktop and Claude Code. Reads schedules, resources, dependencies, critical-path data, and baseline variance β and adds AWP (Advanced Work Packaging, CII) and LPS (Last Planner System, Lean) layers for work-package planning, constraints, weekly commitments and PPC tracking. All local, no cloud calls, no scheduling-tool license required.
Construction, engineering, and BIM workflows live in Microsoft Project schedules. This server lets your LLM:
- Inspect a project schedule and answer questions about it (deadlines, critical path, resource overload).
- Cross-reference task data with quantities from BIM models or with cost data from Power BI dashboards.
- Generate JSON exports for downstream automation (dashboards, reports, ETL pipelines).
It's read-only by design. Project edits stay where they belong: in Microsoft Project itself.
- Python 3.11+
- An MCP-compatible client (Claude Desktop, Claude Code, etc.)
- For
.xml(MSPDI): no extra dependencies - For every other format: the optional
[mpp]extra (requires a JVM via thempxjpackage)
| Format | Extension | Requires [mpp] extra |
|---|---|---|
| Microsoft Project MSPDI XML | .xml |
No |
| Microsoft Project native | .mpp, .mpx |
Yes |
| Primavera P6 export | .xer |
Yes |
| Primavera P6 XML (PMXML) | .pmxml, .xml* |
Yes |
| Synchro Scheduler | .sp |
Yes |
| Asta Powerproject | .pp |
Yes |
* A .xml file that is not MSPDI is automatically retried through the
universal reader (mpxj), so P6 XML exports saved as .xml also load.
Synchro note: mpxj reads Synchro Scheduler .sp files up to the versions it
supports; for recent Synchro 4D Pro projects, exporting XER or MS Project XML
from Synchro is the most reliable path. Once loaded, all 49 tools β
including the AWP and LPS layers β work identically regardless of source
format, since they operate on task UIDs.
git clone https://github.com/jeffersonbim/lean-planning-mcp.git
cd lean-planning-mcp
uv syncpip install git+https://github.com/jeffersonbim/lean-planning-mcp.gitFor .mpp support:
uv sync --extra mpp
# or
pip install "lean-planning-mcp[mpp] @ git+https://github.com/jeffersonbim/lean-planning-mcp.git"Add to your claude_desktop_config.json:
{
"mcpServers": {
"lean-planning-mcp": {
"command": "uv",
"args": [
"--directory",
"C:\\path\\to\\lean-planning-mcp",
"run",
"lean-planning-mcp"
]
}
}
}Restart Claude Desktop. The 49 tools become available in any conversation (14 core MS Project + 17 AWP + 18 LPS).
| Tool | Purpose |
|---|---|
load_project |
Load a schedule into memory β MSPDI .xml, .mpp, P6 .xer/.pmxml, Synchro .sp, Asta .pp |
open_in_ms_project |
Open the loaded (or a given) project file in Microsoft Project via the OS default association |
project_info |
Title, author, schedule window, currency, aggregate counts |
list_tasks |
Filter tasks by type, criticality, name substring, top N |
get_task |
Full record of a single task by UID, ID, or name |
list_resources |
Resources, optionally filtered by type or overallocation |
get_resource_assignments |
Assignments for one or all resources |
find_overallocated_resources |
Resources flagged as overallocated |
get_critical_path |
Tasks on the critical path, sorted by start date |
get_predecessors_successors |
Dependency network for a task |
get_baseline_variance |
Current vs baseline date and duration comparison |
get_gantt_data |
Tasks formatted for Gantt-chart libraries |
export_to_json |
Full project export to JSON file (or inline) |
generate_pbip_dashboard |
Generate a Power BI Project (.pbip) and open it in Power BI Desktop |
If you don't want to install Java for the optional mpp extra, export your
schedule from Microsoft Project as XML:
- Open the
.mppfile in Microsoft Project. - File β Save As β Save as Type β XML Format (*.xml).
- Point
load_projectat the resulting.xml.
The XML format is the official Microsoft Project Data Interchange (MSPDI) schema and contains tasks, resources, assignments, predecessors, baseline, and most of the project metadata.
After loading a project, ask Claude:
Load the project at C:\schedules\obra-acme.xml
Give me the critical path with total duration in days.
Which resources are overallocated and by how much?
List the 5 tasks with the largest baseline variance.
Export the full project to C:\reports\obra-acme.json
AWP and LPS live in the same server but operate as independent layers on
top of the same schedule. They persist to separate sidecar files (awp.json
and lps.json), share no state, and neither depends on the other:
- AWP organizes scope: what gets built, where, and in which package (CWA β CWP β IWP, fed by engineering and procurement packages).
- LPS organizes commitment flow: what the crews promise week by week, what blocks them, and how reliable the planning system is.
You can use either layer alone, or both side by side on the same .mpp.
They are complementary methodologies β AWP answers "is the work package
ready to be released?", LPS answers "will the crew actually do it this
week?" β but in this server they are operated independently, by design.
Construction Industry Institute (CII RT-272 / RT-319) methodology. Breaks execution into aligned packages across engineering, procurement and field:
CWA (Construction Work Area) β CWP (Construction Work Package)
β
IWP (Installation Work Package)
EWP (Engineering Work Package) ββ
ββ gate CWP readiness
PWP (Procurement Work Package) ββ
Focus: path of construction as a planning input + constraint-free release.
A CWP is only ready when its manual requirements are available, all linked
EWPs are issued and all linked PWPs are delivered. IWPs can only be
released to the field after a passing readiness check β the WorkFace
Planning golden rule.
| Tool | Purpose |
|---|---|
awp_list_cwa |
List Construction Work Areas |
awp_upsert_cwa |
Create or update a CWA |
awp_list_cwp |
List CWPs with task_count, total_hours, any_critical |
awp_upsert_cwp |
Create or update a CWP (status: planned/ready/in-progress/complete/on-hold) |
awp_assign_task_to_cwp |
Link a task UID to a CWP (moves it if already elsewhere) |
awp_set_cwp_requirements |
Set CWP requirements (materials, documents, access) |
awp_upsert_ewp |
Create/update an Engineering Work Package (planned/in-progress/issued) |
awp_list_ewp |
List EWPs, optionally by CWP |
awp_upsert_pwp |
Create/update a Procurement Work Package (planned/ordered/delivered) |
awp_list_pwp |
List PWPs, optionally by CWP |
awp_readiness_check |
CWP readiness: requirements + EWPs issued + PWPs delivered. Gates IWP release |
awp_set_path_of_construction |
Define the PoC as a planning input (construction team's decided order) |
awp_path_of_construction |
Return the PoC β manual order if set, else derived from schedule |
awp_generate_iwps |
Split a CWP into IWPs (default 500h β CII crew-week sizing; stamps discipline/crew; preserves released IWPs) |
awp_release_iwp |
Release an IWP to the field β blocked unless the CWP passed its readiness check |
awp_update_iwp_progress |
Field progress 0-100% with earned hours; 100% marks complete |
awp_export_wpr |
Generate a Work Package Release β self-contained JSON for field teams |
Lean Construction method with five planning levels β all implemented:
Master β Phase (pull plan) β Lookahead (N weeks, clears constraints)
β WWP (Weekly Work Plan) β Daily huddle
Core rule enforced (shielding production, Ballard 1998): only
constraint-free tasks enter the Weekly Work Plan. lps_add_commitment
rejects tasks with open constraints unless explicitly overridden β and the
override is recorded on the commitment as a risk.
Metrics: PPC (Percent Plan Complete β promises kept), plus TA (Tasks Anticipated) and TMR (Tasks Made Ready) computed from lookahead snapshots β these measure whether the make-ready process upstream is healthy, not just last week's reliability.
| Tool | Purpose |
|---|---|
lps_list_phases |
List project phases |
lps_upsert_phase |
Create or update a phase (with start/end dates) |
lps_set_pull_plan |
Set execution sequence (pull planning) with task UIDs |
lps_get_pull_plan |
Retrieve a phase's pull plan |
lps_annotate_pull_plan |
Record handoff + conditions of satisfaction on a pull-plan entry |
lps_register_constraint |
Register a constraint (material/document/labor/equipment/access/permit/β¦) |
lps_clear_constraint |
Mark a constraint as resolved |
lps_list_constraints |
List with filters by task, status, type |
lps_lookahead |
N-week horizon with ready/blocked tasks + late-constraint alerts (due_date after task start) |
lps_snapshot_lookahead |
Persist a lookahead snapshot β feeds TA/TMR. Call at every weekly review |
lps_add_commitment |
Add a commitment β blocks tasks with open constraints (override: allow_constrained) |
lps_mark_complete |
Close a commitment with variance_reason + optional corrective_action (PDCA) |
lps_log_daily |
Daily-huddle entry against a committed task (level 5) |
lps_get_daily_log |
Read daily-huddle entries for a week |
lps_get_wwp |
Read a weekly work plan |
lps_workable_backlog |
Ready-but-uncommitted tasks β the fallback buffer for the week |
lps_reliability |
TA / TMR series β health of the make-ready process |
lps_ppc |
Compute PPC for a single week or a series of the last N weeks |
Constraint types: material, document, information, design, labor, equipment, access, permit, prerequisite, other.
Variance reasons: weather, design_change, material_delay, labor_unavailable, equipment_breakdown, rework, permit, prerequisite_incomplete, scope_change, other.
The repo ships a versioned adaptive skill at skills/lean-planning/SKILL.md. It detects whether the MCP tools are available in the session:
- Operation mode (MCP present): drives the 49 tools in the correct order β AWP setup sequence, weekly LPS ritual (lookahead + snapshot, binary close-out + PPC/variance), release gates, metric interpretation.
- Advisor mode (MCP absent): pure methodology β manual PPC/TA/TMR calculation from pasted data, analysis of exported MSPDI XML, IWP sizing review, cross-layer insights. The skill announces which mode is active and falls back gracefully if the server is configured but offline.
# Windows
xcopy /E /I skills\lean-planning %USERPROFILE%\.claude\skills\lean-planning
# macOS / Linux
cp -r skills/lean-planning ~/.claude/skills/lean-planningUpload dist/lean-planning-skill.zip in Settings β Capabilities β Skills. Without the MCP server the skill runs in advisor mode; in Claude Desktop with the MCP server configured it runs in full operation mode.
The .mpp/.xml file remains authoritative (read-only preserved). Next to
the project file, an <name>.awp/ folder holds metadata that Microsoft
Project does not represent well:
C:\schedules\
βββ obra-acme.mpp β authoritative schedule (never modified)
βββ obra-acme.awp/ β sidecar folder, created on demand
βββ awp.json β CWA / CWP / IWP / EWP / PWP + path of construction
βββ lps.json β phases, pull plans, constraints, WWPs, snapshots
Every write updates updated_at (ISO 8601 UTC) in the JSON.
uv sync --extra dev
uv run pytest -v