Skip to content

Use verifier-provided interval for continuous attestation timing#1079

Merged
ansasaki merged 2 commits intokeylime:masterfrom
sergio-correia:next-attestation-interval
Aug 15, 2025
Merged

Use verifier-provided interval for continuous attestation timing#1079
ansasaki merged 2 commits intokeylime:masterfrom
sergio-correia:next-attestation-interval

Conversation

@sergio-correia
Copy link
Copy Markdown
Contributor

No description provided.

Signed-off-by: Sergio Correia <scorreia@redhat.com>
Signed-off-by: Sergio Correia <scorreia@redhat.com>
@codecov
Copy link
Copy Markdown

codecov Bot commented Aug 14, 2025

Codecov Report

❌ Patch coverage is 53.84615% with 24 lines in your changes missing coverage. Please review.
✅ Project coverage is 58.95%. Comparing base (fac6d6f) to head (85a482c).
⚠️ Report is 2 commits behind head on master.

Files with missing lines Patch % Lines
keylime/src/structures/evidence_handling.rs 45.83% 13 Missing ⚠️
keylime-push-model-agent/src/state_machine.rs 54.54% 10 Missing ⚠️
keylime/src/context_info.rs 83.33% 1 Missing ⚠️
Additional details and impacted files
Flag Coverage Δ
e2e-testsuite 58.95% <53.84%> (-0.06%) ⬇️
upstream-unit-tests 58.95% <53.84%> (-0.06%) ⬇️

Flags with carried forward coverage won't be shown. Click here to find out more.

Files with missing lines Coverage Δ
keylime/src/context_info.rs 56.25% <83.33%> (+0.31%) ⬆️
keylime-push-model-agent/src/state_machine.rs 21.01% <54.54%> (+5.69%) ⬆️
keylime/src/structures/evidence_handling.rs 57.25% <45.83%> (-2.57%) ⬇️

... and 3 files with indirect coverage changes

🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.

Copy link
Copy Markdown
Contributor

@ansasaki ansasaki left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM!

@ansasaki ansasaki merged commit 986e7a0 into keylime:master Aug 15, 2025
13 of 16 checks passed
@sergio-correia sergio-correia deleted the next-attestation-interval branch August 18, 2025 13:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants