M1: 14 October, registry page part two merged
M1: 14 October, processing-window model pull request 2 merged
M1: 14 October, processing-window admission released, pull request 1 merged
M1: 14 October, fold of every settleable request landed (#518 closed)
M1: 14 October, create from one output and the fold's second half merged
M1: 13 October evening reconciliation
M1: Lean model and economics paper now, implementation after the review
M1: protected rejection moves after the Demo 1 review
M1: the rejection penalty is a new bond parameter, not the deposit
M1: the new preprod registry is authorized after the contract changes; expected to be the permanent one
M1: Koios answers are unverified under the Lockness rules; several providers deferred
M1: Demo 1 reads the chain through Koios only
M1: page from chain and many-per-fold started; reference restoration parked
M1: protected rejection released for coding
M1: restoring missing references is re-cut into small slices
M1: 13 October reconciliation: main tests and #531 landed, two lanes released, #518 PR 3 sequenced after #545, unmapped issues placed
M1: #559 merged (PR 577, 3bff7e6c): all 13 negative-host pairs have mutants
M1: the CLI split landed; keri stub merged (PR 561, 6d2de3a5)
M1: #518 PR 2 merged (PR 569, e3af83c1)
M1: the census merged (PR 572, 6cb27c70)
M1: negative host landed (#358 part B2, PR 567, 1d9f8b0d)
M1: main's tests are real (PR 571 merged, 2c61a1c2); 0.10.1 released
M1: #358 part B1 merged (PR 558, 403b4800); #518 PR 2 in the slot
M1: #547 merged (PR 554, 95e1d880); #358 part B1 in the slot
M1: #518 PR 1 merged (PR 556, 9d5f4c7a); #547 in the slot
M1: PR 550 (#358 slice 3A) merged; #518 PR 1 in the slot; release 0.10.0 prepared
M1: #381 merged (PR 433, f6783383); PR 550 in the slot
M1: staffing and quality-lane facts in the summary
M1: #381 in the slot, PR 550 ready, #518 PR 1 approved, #547 added to the command-line split
M1: #528 merged (PR 535, c6748950); keri stub next