Repository navigation
Help dock task_calendar
Task Calendar summarizes scheduled tasks by day and turns a selected date into a server-side task filter for the active task scope.
Use previous and next month to move through time, Today to return to the current month, and the
clear action to remove the selected day. A day cell shows matching loaded tasks and a compact
+ more indicator when they exceed the visible limit.
Selecting a day applies its date boundary to Task Manager on the server. It is not merely a visual highlight. Clearing the date restores the previous non-date task scope.
Calendar and Gantt operate on matching task data available to the current workspace. If the task browser has more server pages, load them when the view needs the complete matching set. The selected day message states which date is currently filtering tasks.
- Open the required task scope or Search selection.
- Navigate to the required month.
- Select a day to filter matching deadlines or scheduled work.
- Open a task in Tasks or Task Inspector for editing.
- Clear the date to return to the wider task result.
- An empty day means no accessible task matches the active scope and date.
- Tasks without usable start or end dates cannot be positioned reliably in the calendar.
- Server filtering keeps the selected day while loading; an error does not silently switch dates.
- Date labels follow the interface locale, while stored task dates remain project data.
Gantt and the separate Task Calendar dock use the same Frame layout in Handler and Stream. Use the pencil on a task to edit its schedule without dragging. Apply to draft stages dates and progress together; Save task changes performs the existing server write. Undo/Redo affect pending schedule edits and preserve other task drafts. Escape cancels an unfinished pointer gesture.
Calendar month navigation and Agenda keep the current task owner. Select a day to filter Task Browser; clear it to return. Calendar does not replace Gantt. Dependency connectors show actual links between loaded, visible scheduled tasks; they do not infer missing tasks or cascade schedule changes automatically. Project milestones retain their linked-task plan and existing save/conflict controls. Native milestone SObject storage and browser revision review remain separate client capabilities.
TACTIC-Handler · Releases · Issues · English · Русский
English
- Home
- Installation
- Feature tour
- User guide
- Assistant
- Dashboards
- Knowledge Base
- Maya / Shelf
- Plugins / Плагины
Русский
- Главная
- Установка
- Обзор возможностей
- Руководство пользователя
- Помощник
- Дашборды
- База знаний
- Maya / Shelf
- Plugins / Плагины
Development / Разработка