Description: Two-week internal stress test where the FMS team plus 2–3 trusted reviewers (e.g., shift, Dmytro, a Teams or ODSP engineer using FMS in a real product) actively use the prepped motion components in development. Issues are filed, triaged, and addressed during the test period. Captured as a single workstream item.
Why it matters: Substitute for the formal v9 bug bash, which is deferred to publish. Produces real consumer signal on the prepped surface before the readiness report finalizes.
- Difficulty: Easy-Medium per UXE; coordination-heavy
- Sequencing: M3 w11–12
- Tags:
partner-pickup
- Note: Readiness report explicitly notes "formal v9 bug bash (US + EU rounds) deferred to publish cycle."
Description: Two-week internal stress test where the FMS team plus 2–3 trusted reviewers (e.g., shift, Dmytro, a Teams or ODSP engineer using FMS in a real product) actively use the prepped motion components in development. Issues are filed, triaged, and addressed during the test period. Captured as a single workstream item.
Why it matters: Substitute for the formal v9 bug bash, which is deferred to publish. Produces real consumer signal on the prepped surface before the readiness report finalizes.
partner-pickup