Implementation Blueprint - Full System Architecture #1
Replies: 5 comments
Implementation Log — Step 1: Project ScaffoldingStatus: Partially complete ObjectiveCreate the initial DriftLock monorepo structure and define the shared contracts that later services will use. Completed Work1. Bun monorepo with workspacesThe root "packageManager": "bun@1.3.11"The repository uses Bun workspaces: "workspaces": [
"packages/*",
"apps/*"
]The current workspace packages are:
This structure separates shared domain contracts, parsing, Git operations, sandbox execution, AI-agent logic, testing, and the CLI application. 2. Turborepo pipeline configurationThe repository includes The pipeline defines tasks for:
The This configuration provides a common task interface for all packages and allows Turborepo to coordinate workspace commands. 3. Core domain typesThe shared domain types are defined in The primary types are:
Supporting types also include:
These types define the data contract between the parser, Git tracker, sandbox runner, agent, CLI, and test packages. Pending Work4. Docker Compose for PostgreSQL and RedisThis item is not complete. The repository does not currently contain a Docker Compose configuration file. PostgreSQL and Redis services are therefore not yet available through local container orchestration. The next implementation task is to add a Compose file that defines:
Notes and RationaleThe project starts with shared types because each subsystem must use the same data model. This reduces contract drift between source analysis, test execution, drift detection, and automated fix generation. The workspace structure keeps each subsystem independently maintainable while allowing shared local dependencies through Bun workspaces. The Turborepo pipeline provides a single build, test, lint, and type-check workflow across the monorepo. Next StepComplete the Docker Compose configuration for PostgreSQL and Redis. Then verify that all workspace entry points, lint tasks, and database configuration are executable in CI. |
|
TODO: Add a demo video at last of project, so that product is easily understandable |
Implementation Log 001: Project Scaffolding and Initial ComponentsDate: 2026-09-13 Step 1: What is complete
Additional implementation already startedThese are partial implementations, not completed blueprint milestones:
The CLI currently reports Git file changes rather than API snapshot differences. Its The web dashboard and automated PR generation remain outstanding. Stabilization included in PR #6
Why: Make the initial components more reliable while avoiding unsafe defaults, broken configuration, and misleading success messages. ValidationThe CI job on PR #6 completed successfully before merge. This confirms the configured CI checks passed, not that the complete drift-detection system is implemented or production-ready. Follow-up
Milestone conclusion: The shared project foundation is in place, and several later components have initial implementations. Step 1 should remain partially complete until local PostgreSQL + Redis setup is delivered. |
|
Database wiring for installations:
|
Implementation Log 002: Database Foundation and Product ResearchDate: 2026-09-15 What is complete
Research and documentation added
These are documentation and research changes, not evidence that the described monitoring, classification, or automated PR workflow is implemented. Competitor claims were not independently revalidated for this log. Integration status after PR #7
No current application code consumes the new database package. The sandbox still returns an empty traffic-capture array, and CLI References: Stabilization included in PR #7
Why: Restore compatibility with sandbox callers and retain test execution through the existing centralized test package. ValidationThe CI job on PR #7 completed successfully on final PR commit The configured typecheck, build, unit-test, integration-test, E2E-test, and coverage steps passed. This does not verify the new Compose setup or migration: CI provisions PostgreSQL separately, contains no migration step, and the existing tests do not exercise the new database package. No local services or migrations were run for this log. References: Follow-up
Milestone conclusion: PR #7 establishes the database foundation and supplies the previously missing PostgreSQL Compose configuration. Step 1 remains partially complete because Redis and local setup verification are outstanding; the end-to-end drift-detection and remediation workflow is not yet implemented. |
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
DriftLock Implementation Blueprint
Overview
Build a complete API drift detection system: parser → agent → CLI+UI → git tracker → Docker sandbox → auto-fix PRs.
Tech Stack
Implementation Steps
Step 1: Project Scaffolding
CallSite,Snapshot,DriftEvent,FixStep 2: Parser Package
stripe.*call site detectionStep 3: Git Tracker
Step 4: Sandbox
Step 5: Agent
Step 6: CLI
driftlock analyze- Find API callsdriftlock test- Sandbox executiondriftlock diff- Compare snapshotsdriftlock fix- Generate fixesStep 7: Web Dashboard
Step 8: PR Generation
Open Questions
Next Actions
Created: $(date '+2026-09-12')
Last Edited: $(date '+2026-09-14')
Status: Building