Skip to content

Conversation

@tkordenbrock
Copy link
Member

The Portals4 MTL allocates two Portals IDs requesting specific
well-known IDs and assumes that those IDs are allocated. If those IDs
are in use, PtlPTAlloc() will allocate a different ID. This commit
verifies that the requested IDs were allocated.

The Portals4 MTL allocates two Portals IDs requesting specific
well-known IDs and assumes that those IDs are allocated.  If those IDs
are in use, PtlPTAlloc() will allocate a different ID.  This commit
verifies that the requested IDs were allocated.
@lanl-ompi
Copy link
Contributor

Refer to this link for build results (access rights to CI server needed):
http://jenkins.open-mpi.org/job/ompi_master_pr_distcheck/32/
Test PASSed.

@lanl-ompi
Copy link
Contributor

Refer to this link for build results (access rights to CI server needed):
http://jenkins.open-mpi.org/job/ompi_master_pr_cle5.2up02/121/
Test PASSed.

@mellanox-github
Copy link

@mellanox-github
Copy link

Refer to this link for build results (access rights to CI server needed):
http://bgate.mellanox.com/job/gh-ompi-master-pr/612/

@regrant
Copy link
Contributor

regrant commented Jun 9, 2015

Looks good. Merged.

regrant added a commit that referenced this pull request Jun 9, 2015
…Alloc.result

mtl-portals4: Verify the result of PtlPTAlloc()
@regrant regrant merged commit 8dd9183 into open-mpi:master Jun 9, 2015
@tkordenbrock tkordenbrock deleted the topic/portals4.verify.PtlPTAlloc.result branch June 10, 2015 15:47
jsquyres pushed a commit to jsquyres/ompi that referenced this pull request Nov 10, 2015
op: allow user operations in ompi_3buff_op_reduce
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants