Skip to content

Conversation

@GoeLin
Copy link
Member

@GoeLin GoeLin commented Sep 12, 2025

I had to resolve three files and adapt the tests to compile (see extra commit)

test/hotspot/jtreg/serviceability/dcmd/framework/VMVersionTest.java
Resolved test instructions as later change was already backported.

test/jdk/java/lang/module/ModuleDescriptorTest.java
Several resolves. Some previous changes that can not be backported.

test/lib/jdk/test/lib/util/ModuleInfoWriter.java
Resolved


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • JDK-8304163 needs maintainer approval

Issue

  • JDK-8304163: Move jdk.internal.module.ModuleInfoWriter to the test library (Enhancement - P4 - Approved)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk17u-dev.git pull/3917/head:pull/3917
$ git checkout pull/3917

Update a local copy of the PR:
$ git checkout pull/3917
$ git pull https://git.openjdk.org/jdk17u-dev.git pull/3917/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 3917

View PR using the GUI difftool:
$ git pr show -t 3917

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk17u-dev/pull/3917.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Sep 12, 2025

👋 Welcome back goetz! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Sep 12, 2025

@GoeLin This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8304163: Move jdk.internal.module.ModuleInfoWriter to the test library

Reviewed-by: phh

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 28 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot changed the title backport 622f239448c2a96a74202621ee84c181d79fbde4 8304163: Move jdk.internal.module.ModuleInfoWriter to the test library Sep 12, 2025
@openjdk
Copy link

openjdk bot commented Sep 12, 2025

This backport pull request has now been updated with issue from the original commit.

@openjdk openjdk bot added backport Port of a pull request already in a different code base rfr Pull request is ready for review labels Sep 12, 2025
@mlbridge
Copy link

mlbridge bot commented Sep 12, 2025

Webrevs

@GoeLin
Copy link
Member Author

GoeLin commented Sep 13, 2025

GHA failure: Annotations test needs adption.
linux-x64,
macos-aarch64
macos-x64
windows-x64

Update: passes now.

@openjdk
Copy link

openjdk bot commented Sep 16, 2025

⚠️ @GoeLin This change is now ready for you to apply for maintainer approval. This can be done directly in each associated issue or by using the /approval command.

@GoeLin
Copy link
Member Author

GoeLin commented Sep 17, 2025

Thanks for the review!

@openjdk openjdk bot added approval Requires approval; will be removed when approval is received ready Pull request is ready to be integrated and removed approval Requires approval; will be removed when approval is received labels Sep 17, 2025
@GoeLin
Copy link
Member Author

GoeLin commented Sep 17, 2025

/integrate

@openjdk
Copy link

openjdk bot commented Sep 17, 2025

Going to push as commit 6cc8472.
Since your change was applied there have been 29 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label Sep 17, 2025
@openjdk openjdk bot closed this Sep 17, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Sep 17, 2025
@openjdk
Copy link

openjdk bot commented Sep 17, 2025

@GoeLin Pushed as commit 6cc8472.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

@GoeLin GoeLin deleted the goetz_backport_8304163 branch September 17, 2025 12:56
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Port of a pull request already in a different code base integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

2 participants