Skip to content
This repository was archived by the owner on Jun 14, 2019. It is now read-only.

Conversation

@vrutkovs
Copy link

ci-operator should wait for 10 mins for pod to be deleted, as teradown
in e2e-aws takes about 7 mins to complete on average

See discussion in #353

ci-operator should wait for 10 mins for pod to be deleted, as teradown 
in e2e-aws takes about 7 mins to complete on average
@openshift-ci-robot openshift-ci-robot added the size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. label Jun 12, 2019
@petr-muller
Copy link
Member

/approve
/lgtm

@openshift-ci-robot openshift-ci-robot added the lgtm Indicates that a PR is ready to be merged. label Jun 13, 2019
@openshift-ci-robot
Copy link

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: petr-muller, vrutkovs

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci-robot openshift-ci-robot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jun 13, 2019
@openshift-merge-robot openshift-merge-robot merged commit 4b91a02 into openshift:master Jun 13, 2019
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants