Skip to content

NE-2292: Add Gateway API OLM to NO-OLM migration upgrade test#30897

Draft
gcs278 wants to merge 1 commit intoopenshift:mainfrom
gcs278:gwapi-olm-upgrade-test
Draft

NE-2292: Add Gateway API OLM to NO-OLM migration upgrade test#30897
gcs278 wants to merge 1 commit intoopenshift:mainfrom
gcs278:gwapi-olm-upgrade-test

Conversation

@gcs278
Copy link
Contributor

@gcs278 gcs278 commented Mar 18, 2026

Add upgrade test validating Gateway API migration from OLM-based Istio to CIO-managed Sail Library during 4.21 to 4.22 upgrades.

Setup creates Gateway/HTTPRoute with OLM provisioning and tests connectivity. Test validates migration: Gateway remains programmed, Istiod running, Istio CRDs stay OLM-managed, GatewayClass has CIO finalizer, Istio CR deleted, subscription persists. Teardown cleans up all resources.

CC: @rhamini3

@openshift-ci-robot
Copy link

Pipeline controller notification
This repo is configured to use the pipeline controller. Second-stage tests will be triggered either automatically or after lgtm label is added, depending on the repository configuration. The pipeline controller will automatically detect which contexts are required and will utilize /test Prow commands to trigger the second stage.

For optional jobs, comment /test ? to see a list of all defined jobs. To trigger manually all jobs from second stage use /pipeline required command.

This repository is configured in: automatic mode

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Mar 18, 2026
@openshift-ci-robot
Copy link

openshift-ci-robot commented Mar 18, 2026

@gcs278: This pull request references NE-2292 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "4.22.0" version, but no target version was set.

Details

In response to this:

Add upgrade test validating Gateway API migration from OLM-based Istio to CIO-managed Sail Library during 4.21 to 4.22 upgrades.

Setup creates Gateway/HTTPRoute with OLM provisioning and tests connectivity. Test validates migration: Gateway remains programmed, Istiod running, Istio CRDs stay OLM-managed, GatewayClass has CIO finalizer, Istio CR deleted, subscription persists. Teardown cleans up all resources.

CC: @rhamini3

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Mar 18, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 18, 2026

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@coderabbitai
Copy link

coderabbitai bot commented Mar 18, 2026

Important

Review skipped

Auto reviews are limited based on label configuration.

🚫 Excluded labels (none allowed) (1)
  • do-not-merge/work-in-progress

Please check the settings in the CodeRabbit UI or the .coderabbit.yaml file in this repository. To trigger a single review, invoke the @coderabbitai review command.

⚙️ Run configuration

Configuration used: Organization UI

Review profile: CHILL

Plan: Pro

Run ID: 7af551d8-2b58-4234-a929-56eacd2f1aa1

You can disable this status message by setting the reviews.review_status to false in the CodeRabbit configuration file.

Use the checkbox below for a quick retry:

  • 🔍 Trigger review
✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
📝 Coding Plan
  • Generate coding plan for human review comments

Comment @coderabbitai help to get the list of available commands and usage tips.

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 18, 2026
@gcs278
Copy link
Contributor Author

gcs278 commented Mar 18, 2026

/test e2e-gcp-ovn-upgrade

@gcs278
Copy link
Contributor Author

gcs278 commented Mar 18, 2026

/test ?

@gcs278 gcs278 force-pushed the gwapi-olm-upgrade-test branch from 90dbe8d to ac9d301 Compare March 18, 2026 02:02
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 18, 2026

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: gcs278
Once this PR has been reviewed and has the lgtm label, please assign deads2k for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot removed the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 18, 2026
@gcs278
Copy link
Contributor Author

gcs278 commented Mar 18, 2026

/test e2e-gcp-ovn-upgrade

@gcs278 gcs278 force-pushed the gwapi-olm-upgrade-test branch from ac9d301 to b08e876 Compare March 18, 2026 04:03
Add upgrade test validating Gateway API migration from OLM-based Istio
to CIO-managed Sail Library during 4.21 to 4.22 upgrades.

Setup creates Gateway/HTTPRoute with OLM provisioning and tests
connectivity. Test validates migration: Gateway remains programmed,
Istiod running, Istio CRDs stay OLM-managed, GatewayClass has CIO
finalizer, Istio CR deleted, subscription persists. Teardown cleans
up all resources.
@gcs278 gcs278 force-pushed the gwapi-olm-upgrade-test branch from b08e876 to 4df0775 Compare March 18, 2026 04:04
@gcs278
Copy link
Contributor Author

gcs278 commented Mar 18, 2026

/test e2e-gcp-ovn-upgrade

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 18, 2026

@gcs278: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-gcp-ovn-upgrade 4df0775 link true /test e2e-gcp-ovn-upgrade

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-trt
Copy link

openshift-trt bot commented Mar 18, 2026

Risk analysis has seen new tests most likely introduced by this PR.
Please ensure that new tests meet guidelines for naming and stability.

New Test Risks for sha: 4df0775

Job Name New Test Risk
pull-ci-openshift-origin-main-e2e-gcp-ovn-upgrade High - "[sig-network-edge][Feature:Router][apigroup:gateway.networking.k8s.io] Verify Gateway API migration from OLM to NO-OLM during upgrade" is a new test that failed 1 time(s) against the current commit

New tests seen in this PR at sha: 4df0775

  • "[sig-network-edge][Feature:Router][apigroup:gateway.networking.k8s.io] Verify Gateway API migration from OLM to NO-OLM during upgrade" [Total: 1, Pass: 0, Fail: 1, Flake: 0]

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants