We read every piece of feedback, and take your input very seriously.
To see all available qualifiers, see our documentation.
There was an error while loading. Please reload this page.
Roadmap page reorganized by domain; deployment references point at #156
Admin-Panel + Content-Model + Roadmap: scheduled unpublish (#133)
Admin-Panel + Roadmap: the editorial calendar (#132)
Admin-Panel + Roadmap: the translation queue (#131)
Admin-Panel + Roadmap: bulk actions (#130)
Admin-Panel + Storage-Backends + Roadmap: global admin search (#129, ADR-0038)
Admin-Panel + Roadmap: the deployment wizard (#128, second slice)
Admin-Panel + Getting-Started + Roadmap: the browser setup wizard (#128)
Admin-Panel + Roadmap: the page editor UX (#127)
ADR-0037 closed vertically: items usable end to end (#126)
Roadmap: the product review — issue-tracked queue, P0-P3, honest done
Content-Model + Roadmap: ADR-0037 accepted (sections grow up)
Language-Packs page: the pack authoring guide (ADR-0034 closes)
Extensions + Admin-Panel + Roadmap: panel catalogs from packs (ADR-0034 admin phase)
Themes + Roadmap: flow-relative CSS shipped, RTL end to end
Configuration: the source_language row (ADR-0034 slice shipped)
No language data outside packs
The multilingual map and the coverage cell
Language packs end to end (ADR-0034 phase 1b)
ADR-0034 phase 1a: the locale type opens
cms doctor ships; Milestone 7 closed
On-publish webhooks (ADR-0036)
TOTP two-factor authentication (ADR-0035)
Notifications ship; ADR-0032 accepted
Roadmap: ADR-0034 language packs written
ADR-0032 phase 1: reset + pluggable mail transports; language invariant
Scope horizons M8/M9 and the trunk-based branching record
Roadmap: ADR-0032 email/notifications contract fixed
Content API ships; Milestone 6 closed
Roadmap: ADR-0031 comments contract fixed