-
Notifications
You must be signed in to change notification settings - Fork 9
Open
quintel/etmodel
#4627Labels
PinnedWill never be marked as stale or auto-closed.Will never be marked as stale or auto-closed.
Description
Currently, we have two FLH sliders for offshore wind:
flh_of_energy_power_wind_turbine_offshoresets the FLHs of 'regular' offshore wind and hybrid offshore windflh_of_energy_hydrogen_wind_turbine_offshoresets the FLHs of offshore wind for dedicated hydrogen production.
It makes no sense that there's a separate slider for dedicated hydrogen production. Therefore, dedicated hydrogen production should be added to flh_of_energy_power_wind_turbine_offshore and flh_of_energy_hydrogen_wind_turbine_offshoreshould be removed.
This requires:
- Updating
flh_of_energy_power_wind_turbine_offshore - Updating
flh_of_energy_power_wind_turbine_offshore_user_curve - Removing
flh_of_energy_hydrogen_wind_turbine_offshore
Note that as tackled in this PR, both the FLHs of energy_hydrogen_wind_turbine_offshore and energy_hydrogen_electrolysis_wind_electricity should be updated.
In addition, a migration should be written.
Tackles one of the steps mentioned in this issue quintel/etengine#1487 (comment)
Metadata
Metadata
Assignees
Labels
PinnedWill never be marked as stale or auto-closed.Will never be marked as stale or auto-closed.