Bump GHA actions to Node 24 versions#104
Conversation
actions/checkout@v4 and nix-community/cache-nix-action@v6 run on Node 20, which GitHub deprecates: forced switch 2026-06-02, removal 2026-09-16. - actions/checkout@v4 -> @v6 (node24) - nix-community/cache-nix-action@v6 -> @v7 (node24) https://github.blog/changelog/2025-09-19-deprecation-of-node-20-on-github-actions-runners/ Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
Warning Rate limit exceeded
To keep reviews running without waiting, you can enable usage-based add-on for your organization. This allows additional reviews beyond the hourly cap. Account admins can enable it under billing. ⌛ How to resolve this issue?After the wait time has elapsed, a review can be triggered using the We recommend that you space out your commits to avoid hitting the rate limit. 🚦 How do rate limits work?CodeRabbit enforces hourly rate limits for each developer per organization. Our paid plans have higher rate limits than the trial, open-source and free plans. In all cases, we re-allow further reviews after a brief timeout. Please see our FAQ for further information. ℹ️ Review info⚙️ Run configurationConfiguration used: Organization UI Review profile: ASSERTIVE Plan: Pro Run ID: 📒 Files selected for processing (5)
✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
|
@coderabbitai assess this PR size classification for the totality of the PR with the following criterias and report it in your comment: S/M/L PR Classification Guidelines:This guide helps classify merged pull requests by effort and complexity rather than just line count. The goal is to assess the difficulty and scope of changes after they have been completed. Small (S)Characteristics:
Review Effort: Would have taken 5-10 minutes Examples:
Medium (M)Characteristics:
Review Effort: Would have taken 15-30 minutes Examples:
Large (L)Characteristics:
Review Effort: Would have taken 45+ minutes Examples:
Additional Factors to ConsiderWhen deciding between sizes, also consider:
Notes:
|
Summary
actions/checkout@v4->@v6(usesnode24)nix-community/cache-nix-action@v6->@v7(usesnode24)rainix.yaml,subgraph-test.yaml,manual-rs-release.yml,manual-sol-artifacts.yml,manual-subgraph-deploy.ymlGitHub deprecation deadlines: forced Node 24 switch on 2026-06-02, Node 20 removed from runners 2026-09-16.
Ref: https://github.blog/changelog/2025-09-19-deprecation-of-node-20-on-github-actions-runners/
Test plan
🤖 Generated with Claude Code