Skip to content

Conversation

@sspencerwire
Copy link
Contributor

@sspencerwire sspencerwire commented Nov 12, 2025

  • the EPEL has not built it yet, and may not
  • add a hold to the instructions for 10 for now

Author checklist (Completed by original Author)

  • Good fit for the Rocky Linux project? Title and Author Metatags inserted ?
  • If applicable, steps and instructions have been tested to work
  • Initial self-review to fix basic typos and grammar completed

Rocky Documentation checklist (Completed by Rocky team)

  • 1st Pass (Document is good fit for project and author checklist completed)
  • 2nd Pass (Technical Review - check for technical correctness)
  • 3rd Pass (Detailed Editorial Review and Peer Review)
  • Final approval (Final Review)

* the EPEL has not built it yet, and may not
* add a hold to the instructions for 10 for now
@github-actions
Copy link

Test results for 0ef99d2:

Number of broken URLs: 6

URL,RESULT,FILENAME
 https://support.torproject.org/glossary/pluggable-transports/,failed,guides/proxies/tor_relay.md
 http://your_ip,failed,guides/cms/mediawiki.md
 http://$(hostname):8080,failed,guides/repositories/pulp_fetch_upload.md
 https://ftp.gnu.org/gnu/tar/,failed,guides/backup/tar.md
 https://ftp.gnu.org/gnu/hello/hello-2.12.tar.gz,failed,labs/systems_administration_I/lab7-software_management.md
 https://repocompare.rockylinux.org,failed,release_notes/8_5.md

@sspencerwire sspencerwire merged commit 699d55d into rocky-linux:main Nov 12, 2025
3 checks passed
@sspencerwire sspencerwire deleted the 10_terminator_warning branch November 13, 2025 16:02
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant