Skip to content

Conversation

@sspencerwire
Copy link
Contributor

@sspencerwire sspencerwire commented Dec 6, 2021

Author checklist (to be completed by original Author)

  • Is this document a good fit for the Rocky project ?
  • Is this a non-English contribution?
  • Title and Author MetaTags have been inserted into the document
  • If applicable, steps and instructions have been tested to work on a real system
  • Did you perform an initial self-review to fix basic typos and grammatical correctness

Rocky Documentation checklist (to be completed by Rocky team)

  • 1st Pass (Check that document is good fit for project and author checklist completed)
  • 2nd Pass (Technical Review - check for technical correctness)
  • 3rd Pass (Basic Editorial Review)
  • 4th Pass (Detailed Editorial Review and Peer Review)
  • 5th Pass (Include document in TOC)
  • Final pass/approval (Final Review)

Antoine Le Morvan and others added 3 commits December 6, 2021 11:44
* Checked spelling
* Checked punctuation and fixed some out of place ":"
* Slight wording change in a couple of spots to help make it more clear
* Changed the date format of the meta to "06-Dec-2021". I think we are
going to have to standardize on the month in 3 letter representation so
that regardless of what postion it falls in, it will always mean the
same thing. "Dec-06-2021" (whereas 06-12-2021 and 12-06-2021 mean
different things to different people. Is it the 6th of December, or the
12th of June?
@sspencerwire sspencerwire merged commit de6add8 into rocky-linux:main Dec 6, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant