Total engineering budget across the loop's output:
- Tier 1 (Q3 2026): ~490 LOC, 3-4 person-weeks
- Tier 2 (Q3-Q4 2026): ~1180 LOC, 6-8 person-weeks
- Tier 3 (2027): ~1140 LOC, 8-10 person-weeks
- Tier 4-5 (long horizon): ~700+ LOC, 6-8 person-weeks
- TOTAL: ~3,500 LOC, ~25 person-weeks
Tier 1 (next quarter) ships:
- 1.1 wifi-densepose plan-antennas CLI tool (360 LOC) -- 93x placement lift
- 1.2 R12.1 pose-PABS in vital_signs cog (80 LOC) -- 9.36x intruder lift
- 1.3 cog-person-count v0.0.3 chest-centric (50 LOC)
- 1.4 ADR-029 amendment w/ ADR-113 matrix (0 LOC)
Critical-path graph:
1.1 + 1.2 -> 1.3 -> 2.1 ruview-fed -> 2.2 DP-vital-signs -> 3.1 cross-install -> 3.2 PQC
+-> 3.3 real-AETHER -> 3.4 fall-detect
+-> 4.x verticals
Why this matters: after 35 ticks of research output, this is the
document that lets a team pick up and ship without re-reading the 34
research notes. Priority alignment, estimate-anchoring, critical-path
visibility — all in one place.
R-thread mapping:
- R5/R6/R6.2 family/R6.1 -> Tier 1
- R12/R12.1 PABS -> Tier 1.2
- R3/R3.1/R3.2/R14/R15 -> Tier 2-3
- R7 mincut -> Tier 2 (in ruview-fed)
- R13 NEGATIVE -> rules out BP, no Tier line
- R10/R11/R16/R17/R18 verticals -> Tier 4-5
Composes with every loop output. Every thread, ADR, vertical sketch
has a line in some Tier. The TERMINAL output that needs the synthesis
power of a research loop to produce.
Honest scope:
- Estimates synthetic-data-based; may shift after bench validation
- Critical-path may have hidden dependencies (e.g. AgentDB schema)
- 25 person-weeks assumes full-time engineers
- Doesn't include integration testing, documentation, deployment ops
- Tiers based on architectural dependency, not business priority
Loop status after 35 ticks:
- 16 research threads
- 6 exotic verticals
- 6 new ADRs (105/106/107/108/109/113)
- 3 negative result categories
- 2 self-corrections
- 3 honest-scope findings
- 9-tick R6 family (complete)
- 3-tick R3 arc (complete)
- 3-tick R12 arc (complete)
- This production roadmap
00-summary.md will follow at 12:00 UTC / 08:00 ET cron stop.
Coordination: ticks/tick-35.md, no PROGRESS.md edit.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Thirty-fifth tick. Terminal output of the loop. Maps every research finding to owner / LOC / dependency / priority across 6 tiers.
Budget breakdown
Tier 1 (next quarter)
1.1 plan-antennas CLI (93× lift) / 1.2 R12.1 pose-PABS (9.36× lift) / 1.3 cog-person-count v0.0.3 / 1.4 ADR-029 amendment.
Why this matters
After 35 ticks, this is the document that lets a team pick up and ship without re-reading the 34 research notes.