Skip to content

research: production roadmap — every loop output mapped to owner/LOC/priority#738

Merged
ruvnet merged 1 commit into
mainfrom
research/sota-production-roadmap
May 22, 2026
Merged

research: production roadmap — every loop output mapped to owner/LOC/priority#738
ruvnet merged 1 commit into
mainfrom
research/sota-production-roadmap

Conversation

@ruvnet
Copy link
Copy Markdown
Owner

@ruvnet ruvnet commented May 22, 2026

Thirty-fifth tick. Terminal output of the loop. Maps every research finding to owner / LOC / dependency / priority across 6 tiers.

Budget breakdown

Tier Timeline LOC Person-weeks
Tier 1 Q3 2026 ~490 3-4
Tier 2 Q3-Q4 2026 ~1180 6-8
Tier 3 2027 ~1140 8-10
Tier 4-5 long horizon ~700+ 6-8
Total ~3,500 ~25

Tier 1 (next quarter)

1.1 plan-antennas CLI (93× lift) / 1.2 R12.1 pose-PABS (9.36× lift) / 1.3 cog-person-count v0.0.3 / 1.4 ADR-029 amendment.

Why this matters

After 35 ticks, this is the document that lets a team pick up and ship without re-reading the 34 research notes.

🤖 Generated with claude-flow

…owner/LOC/priority

Terminal output of the SOTA research loop. Maps every research finding
to owner, LOC estimate, dependency, and priority across 6 tiers.

Total engineering budget across the loop's output:
- Tier 1 (Q3 2026):     ~490 LOC, 3-4 person-weeks
- Tier 2 (Q3-Q4 2026): ~1180 LOC, 6-8 person-weeks
- Tier 3 (2027):       ~1140 LOC, 8-10 person-weeks
- Tier 4-5 (long horizon): ~700+ LOC, 6-8 person-weeks
- TOTAL:               ~3,500 LOC, ~25 person-weeks

Tier 1 (next quarter) ships:
- 1.1 wifi-densepose plan-antennas CLI tool (360 LOC) -- 93x placement lift
- 1.2 R12.1 pose-PABS in vital_signs cog (80 LOC) -- 9.36x intruder lift
- 1.3 cog-person-count v0.0.3 chest-centric (50 LOC)
- 1.4 ADR-029 amendment w/ ADR-113 matrix (0 LOC)

Critical-path graph:
1.1 + 1.2 -> 1.3 -> 2.1 ruview-fed -> 2.2 DP-vital-signs -> 3.1 cross-install -> 3.2 PQC
                                  +-> 3.3 real-AETHER -> 3.4 fall-detect
                                                       +-> 4.x verticals

Why this matters: after 35 ticks of research output, this is the
document that lets a team pick up and ship without re-reading the 34
research notes. Priority alignment, estimate-anchoring, critical-path
visibility — all in one place.

R-thread mapping:
- R5/R6/R6.2 family/R6.1 -> Tier 1
- R12/R12.1 PABS -> Tier 1.2
- R3/R3.1/R3.2/R14/R15 -> Tier 2-3
- R7 mincut -> Tier 2 (in ruview-fed)
- R13 NEGATIVE -> rules out BP, no Tier line
- R10/R11/R16/R17/R18 verticals -> Tier 4-5

Composes with every loop output. Every thread, ADR, vertical sketch
has a line in some Tier. The TERMINAL output that needs the synthesis
power of a research loop to produce.

Honest scope:
- Estimates synthetic-data-based; may shift after bench validation
- Critical-path may have hidden dependencies (e.g. AgentDB schema)
- 25 person-weeks assumes full-time engineers
- Doesn't include integration testing, documentation, deployment ops
- Tiers based on architectural dependency, not business priority

Loop status after 35 ticks:
- 16 research threads
- 6 exotic verticals
- 6 new ADRs (105/106/107/108/109/113)
- 3 negative result categories
- 2 self-corrections
- 3 honest-scope findings
- 9-tick R6 family (complete)
- 3-tick R3 arc (complete)
- 3-tick R12 arc (complete)
- This production roadmap

00-summary.md will follow at 12:00 UTC / 08:00 ET cron stop.

Coordination: ticks/tick-35.md, no PROGRESS.md edit.
@ruvnet ruvnet merged commit ab80280 into main May 22, 2026
13 checks passed
@ruvnet ruvnet deleted the research/sota-production-roadmap branch May 22, 2026 11:00
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant