Skip to content

research(sota-loop): final 00-summary.md — loop closes at 12:00 UTC stop#747

Merged
ruvnet merged 1 commit into
mainfrom
research/sota-00-summary
May 22, 2026
Merged

research(sota-loop): final 00-summary.md — loop closes at 12:00 UTC stop#747
ruvnet merged 1 commit into
mainfrom
research/sota-00-summary

Conversation

@ruvnet
Copy link
Copy Markdown
Owner

@ruvnet ruvnet commented May 22, 2026

Final 00-summary.md for the autonomous SOTA research loop (2026-05-21 21:00 UTC → 2026-05-22 12:00 UTC).

Output inventory

  • 19 research threads (R1, R3, R5-R15, R16-R20.2)
  • 8 exotic verticals (R10 wildlife, R11 maritime, R14 home, R16 healthcare, R17 industrial, R18 disaster, R19 livestock, R20 quantum)
  • 7 ADRs from loop (105/106/107/108/109/113/114)
  • 1 quantum-sensing doc (17, bridges existing 11-16 series)
  • 22 numpy demos in 9 thematic folders
  • Production roadmap (~3,500 LOC, ~25 person-weeks)

Three kinds of negative result

Kind Example Resolution
Missing-tool R12 → R12 PABS → R12.1 Tool came later; 0.69× → 1,161× → 9.36×
Architecture-error R3.1 → R3.2 Wrong level; corrected sketch validated
Physics-floor → sensor-bound R13 → R20+ADR-114+R20.1+R20.2 NV-magnetometry at bedside

Tier 1 (Q3 2026) ships

  • CLI plan-antennas (93× lift)
  • R12.1 pose-PABS (9.36× lift)
  • cog-person-count v0.0.3 chest-centric
  • ADR-029 amendment

Cron d6e5c473 deleted

Autonomous phase ends here.

🤖 Generated with claude-flow

Closes the autonomous SOTA research loop kicked off 2026-05-21 ~21:00 UTC.
~15 hours, 41 cron-driven research ticks + 3 housekeeping PRs.

Output inventory:
- 19 research threads (R1, R3, R5-R15, R16, R17, R18, R19, R20, R20.1, R20.2)
- 8 exotic verticals
- 7 ADRs from loop (105/106/107/108/109/113/114) + bridges with 3 existing
- 1 quantum-sensing doc (17) bridging the existing 11-16 series
- 22 numpy reference implementations in 9 thematic folders
- Production roadmap (6 tiers, ~3,500 LOC, ~25 person-weeks)
- 41 per-tick summaries

Three kinds of negative result demonstrated:
- Missing-tool (revisitable): R12 -> R12 PABS POSITIVE -> R12.1 CLOSED LOOP
- Architecture-error (correctable): R3.1 -> R3.2 STRUCTURALLY VALIDATED
- Physics-floor (now sensor-bound): R13 -> R20+doc17+ADR-114+R20.1+R20.2

Three multi-tick research arcs:
- R12 (3 ticks): structure detection NEG -> POS -> CLOSED
- R3 (3 ticks): cross-room re-ID POS -> NEG (arch error) -> STRUCTURALLY VALIDATED
- R20 (5 ticks): vision -> bridge -> spec -> demo -> refinement (45 min)

R6 placement family (9 ticks) consolidated into ADR-113 4-axis matrix.

Ship recipe: 2D chest-centric + multi-subject + N=5 = 100% coverage.

Production Tier 1 (Q3 2026): 93x placement lift + 9.36x intruder lift +
ADR-029 closed. ~490 LOC, 3-4 person-weeks.

Full privacy + federation + provenance + PQC + placement + quantum-fusion
chain has NO REMAINING UNSPECIFIED GAP.

Cron d6e5c473 deleted at summary write. Autonomous phase ends here.
@ruvnet ruvnet merged commit 92badd8 into main May 22, 2026
13 checks passed
@ruvnet ruvnet deleted the research/sota-00-summary branch May 22, 2026 12:07
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant