Upon completing the pre-alignment of a module in a specific position, the following steps should be followed to glue the module:
The two components of the glue, the epoxy resin (white) and the epoxy hardener (gray) should be mixed together, in equal proportion by weight.
- The first step is to stir the two glue components separately in their own container for uniform viscosity.
- Then 3-4 grams of each epoxy components are to measured and mixed uniformly until the two colors blend.
- The mixed epoxy should be placed in the bubble chamber for about 2-3 minutes to remove the bubbles.
- The mixed glue should be slowly poured in the syringe from a side.
Calibration is the most critical step in gluing and needs to be performed precisely. For each module, the ideal x and y coordinates of the first glue dot are marked on the stave. These coordinates are determined by using the stencil. The goal is to place the syringe right on top of the dot at a Z distance of about 0.5mm.
- In the Visualize Module Position VI, select the Exit option for Corners Enum.
- Press the button for Exit to Survey/Glue and press Done with Module # Corner #.
- Select the option for Glue from the dialogue box that appears.
- Now manually put the syringe in the V shaped holder next to the camera in the Stage.
- A dialogue box will appear on the screen asking the user to accept the Z height. A user has to adjust the Z height at the lowest possible Z. This can be done either by manually adjusting the glue mount or by using the software. The height needs to be precise for dispensing the right size of separate dots.
- The software provides an option to calibrate the Z distance.
- The last step in calibration is adjusting the position of the syringe. The software gives the option to move the mount in all X, Y, and Z. The goal is to place the syringe right on top of the marked dot at a Z distance of about 0.55mm.
- Once the user is confident about the start point, select OH Yeah Start from the dialogue box. The glue will start dispensing in the respective coordinates and will take about 10minutes to complete.
After completion of glue dispensing, the bridge with a module is placed on the pre-aligned position.
- The position of the fiducial in each corners can be observed in the VI. The software displays X and Y offset for that Fiducial.
- A user has to make adjustment in both X and Y for fiducial in each corners until the fiducial lies within the placement tolerance of 25um.
- Once X and Y are within the tolerance slowly lower the Z height and check for X and Y position of the fiducial.
- One is expected to repeat the steps b and c until the module is placed in the stave. A survey of after module placement could be conducted for analysis.