docs(epic-21): attention service implemented (#2229)
Contract 1 documented as built (rows, tidy-up, standing, critical line,
holds-up incl. N3, links via route ids, Not-now endpoints); contract 3
reuses computeHoldsUp; contract 18 attention.snoozed implemented;
Architecture attention service section; Schema user_preferences key;
ADR-040 deviation (system events are never attention rows).
Co-Authored-By: Claude product-architect <noreply@anthropic.com>
docs(api,schema,adr,routes,architecture): History page and GET /api/history implemented (#2224)
- API Contract: contract 17 rewritten as implemented (DiaryEntrySummary items + batch,
derived payment/submission types, object filter, batch collapse, errors); budgetSourceId
- Schema / ADR-040: status_changed.budgetSourceId snapshot and key order; batch collapse
- Route Map: /history done, /diary?filterMode maps page-served; counts
- Architecture: History page, object filter data source, FeedRow actions slot
Co-Authored-By: Claude product-architect <noreply@anthropic.com>
docs(adr,api,schema): system events implemented (#2223)
Co-Authored-By: Claude product-architect <noreply@anthropic.com>
docs(adr,api,schema,routes,architecture): #2223 spec amendments (payment link, snapshot fields, writer context, showHidden)
Co-Authored-By: Claude product-architect <noreply@anthropic.com>
docs(adr,api,schema,architecture): system events design for story 2.4 (#2223)
Co-Authored-By: Claude product-architect <noreply@anthropic.com>
docs: grammar foundations contracts 11 and 19, ADR-040 W3 ledger (#2209)
Co-Authored-By: Claude product-architect <noreply@anthropic.com>
docs(api): scheduler truth — planned vs forecast dates, isLate, milestone delay de-dup (#2199)
docs: DIARY_AUTO_EVENTS planned removal (#2223), system events always written; Undo window 30 s
Co-Authored-By: Claude product-architect <noreply@anthropic.com>
docs: relabel UX restructure epic as EPIC-21 (#2190)
The UX restructure pages added in 4f2e67c used EPIC-19, which already names Backup & Restore.
Existing Backup & Restore EPIC-19 references are unchanged.
Co-Authored-By: Claude product-architect <noreply@anthropic.com>
docs: EPIC-19 UX restructure architecture (ADR-038..040, route map, planned API contracts)
- ADR-038 Information Architecture v2: sidebar-only navigation, shared route map + NavConfig,
kept URLs with permanent vCard/iCal URLs, reachability and click-counting rules
- ADR-039 One Money Service: single Left to spend with strict verdict, percentage grants on
listed items, closed label registry, no schema change
- ADR-040 System Events: metadata v1 params, write-time de-dup incl. A->B->A, data-only backfill,
display collapse, delete nothing
- Route-Map page from routemap.json with owner decisions 2.0 #3/#24 applied
- API-Contract: 18 planned contracts (+2a) marked Planned - EPIC-19
- Deviation Log rows: Schema diary_entries (invoice_created, NULL metadata, invoice_deposit),
API-Contract sourceEntityType, ADR-014 autoReschedule persistence
Co-Authored-By: Claude product-architect <noreply@anthropic.com>