Sync project status to the direct projects #3516

@vikasrohit

Description

@vikasrohit

Expected behavior

  • All project status updates should be reflected in corresponding direct project, if available.
  • Direct project should be created in Draft status if possible.

Actual behavior

  • None of the project status change is synced back to the direct project as of now
  • Direct project is created in Active status by default

Steps to reproduce the problem

  • Create a project in Connect
  • Update the Connect project status to say Cancelled
  • Open the direct project associated with the newly created project
  • Observe that direct project is not cancelled yet

Screenshot/screencast

Screen Shot 2020-01-24 at 5 29 30 PM