Summary

  • Finalized Epic E2 and its three features by moving their development-plan documents into the completed/ folders while updating all status headers with the 2026-01-21 completion metadata.
  • Refreshed the epic and feature indexes so E2 and E2-F1/F2/F3 live exclusively in the Completed sections, and ensured all relative links now point at the relocated documents.

What Changed

Completed Documentation Assets

  • adw-docs/dev-plans/epics/completed/E2-activity-equilibria-refactor.md - Added Completion Notes (summary, deviations, lessons learned, actual vs planned), updated Change Log, and verified the feature table now links to the completed feature docs.
  • adw-docs/dev-plans/features/completed/E2-F1-activity-strategy-refactor.md - Marked status as Completed with dates, refreshed parent epic link to the completed path, and recorded the completion entry in the Change Log.
  • adw-docs/dev-plans/features/completed/E2-F2-equilibria-runnable-refactor.md - Same completion/status updates plus verified parent link.
  • adw-docs/dev-plans/features/completed/E2-F3-integration-documentation.md - Same completion/status updates plus verified parent link.

Index Refresh

  • adw-docs/dev-plans/epics/index.md - Removed E2 from the Active table and added it to Completed to match the Completed-E1 formatting.
  • adw-docs/dev-plans/features/index.md - Added an E2 Completed subsection with rows for E2-F1/E2-F2/E2-F3, each linking into completed/ with the 2026-01-21 completion date; the Active section no longer references those features.

Tests Added/Updated

  • Not applicable (documentation-only changes).

How It Works

This phase is purely documentation cleanup: the epic and feature markdown files are now housed under completed/, their metadata reflects the real completion date, completion notes document what was delivered, and both index tables enumerate the completed work so folks can find the final artifacts.

Implementation Notes

  • Link validation: Manual spot checking confirmed all E2- references now resolve to the completed paths. No automated link checker was run.

Testing

  • Unit tests: Not run (docs-only changes).
  • Integration tests: Not run (docs-only changes).
  • Manual verification: Manual inspection of the moved files and indexes.

- Move epic E2 and its three features into completed folders dated 2026-01-21
- Update completion metadata, parent/child links, and completion notes
- Refresh epics and features indexes to show E2 under completed sections

Closes uncscode#907

ADW-ID: dcf08750
Copilot AI review requested due to automatic review settings January 22, 2026 01:29
@Gorkowski Gorkowski added agent Created or managed by ADW automation blocked Blocked - review required before ADW can process labels Jan 22, 2026
Copy link
Contributor

Copilot AI left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull request overview

This PR completes Epic E2 (Activity and Equilibria Strategy-Builder-Factory Refactor) by moving all development planning documentation to completed folders and updating metadata to reflect the January 21, 2026 completion date.

Changes:

  • Moved Epic E2 and Features E2-F1, E2-F2, E2-F3 from active to completed sections in index files
  • Updated all status fields from "Planning" to "Completed" with start and completion dates
  • Added comprehensive completion notes to the epic document including summary, deviations, lessons learned, and actual vs planned analysis
  • Updated all internal links to point to the relocated completed documentation

Reviewed changes

Copilot reviewed 6 out of 6 changed files in this pull request and generated no comments.

Show a summary per file
File Description
adw-docs/dev-plans/epics/index.md Moved E2 from Active to Completed table with link to completed subdirectory
adw-docs/dev-plans/epics/completed/E2-activity-equilibria-refactor.md Updated status, dates, feature links, added completion notes section, and changelog entry
adw-docs/dev-plans/features/index.md Removed E2-F1/F2/F3 from Active section, added E2 subsection to Completed with all three features
adw-docs/dev-plans/features/completed/E2-F1-activity-strategy-refactor.md Updated status to Completed, dates, parent epic link, and changelog
adw-docs/dev-plans/features/completed/E2-F2-equilibria-runnable-refactor.md Updated status to Completed, dates, parent epic link, and changelog
adw-docs/dev-plans/features/completed/E2-F3-integration-documentation.md Updated status to Completed, dates, parent epic link, and changelog

💡 Add Copilot custom instructions for smarter, more guided reviews. Learn how to get started.

@Gorkowski Gorkowski merged commit 4d3676a into uncscode:main Jan 22, 2026
13 checks passed
@Gorkowski Gorkowski deleted the issue-907-adw-dcf08750 branch January 22, 2026 01:38
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

agent Created or managed by ADW automation blocked Blocked - review required before ADW can process

Projects

None yet

Development

Successfully merging this pull request may close these issues.

[E2-F3-P4] Development Documentation Update and Epic Completion