feat: #907 - [E2-F3-P4] Development Documentation Update and Epic Completion#933
Merged
Gorkowski merged 1 commit intouncscode:mainfrom Jan 22, 2026
Merged
Conversation
- Move epic E2 and its three features into completed folders dated 2026-01-21 - Update completion metadata, parent/child links, and completion notes - Refresh epics and features indexes to show E2 under completed sections Closes uncscode#907 ADW-ID: dcf08750
Contributor
There was a problem hiding this comment.
Pull request overview
This PR completes Epic E2 (Activity and Equilibria Strategy-Builder-Factory Refactor) by moving all development planning documentation to completed folders and updating metadata to reflect the January 21, 2026 completion date.
Changes:
- Moved Epic E2 and Features E2-F1, E2-F2, E2-F3 from active to completed sections in index files
- Updated all status fields from "Planning" to "Completed" with start and completion dates
- Added comprehensive completion notes to the epic document including summary, deviations, lessons learned, and actual vs planned analysis
- Updated all internal links to point to the relocated completed documentation
Reviewed changes
Copilot reviewed 6 out of 6 changed files in this pull request and generated no comments.
Show a summary per file
| File | Description |
|---|---|
| adw-docs/dev-plans/epics/index.md | Moved E2 from Active to Completed table with link to completed subdirectory |
| adw-docs/dev-plans/epics/completed/E2-activity-equilibria-refactor.md | Updated status, dates, feature links, added completion notes section, and changelog entry |
| adw-docs/dev-plans/features/index.md | Removed E2-F1/F2/F3 from Active section, added E2 subsection to Completed with all three features |
| adw-docs/dev-plans/features/completed/E2-F1-activity-strategy-refactor.md | Updated status to Completed, dates, parent epic link, and changelog |
| adw-docs/dev-plans/features/completed/E2-F2-equilibria-runnable-refactor.md | Updated status to Completed, dates, parent epic link, and changelog |
| adw-docs/dev-plans/features/completed/E2-F3-integration-documentation.md | Updated status to Completed, dates, parent epic link, and changelog |
💡 Add Copilot custom instructions for smarter, more guided reviews. Learn how to get started.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Target Branch:
mainFixes #907 | Workflow:
dcf08750Summary
completed/folders while updating all status headers with the 2026-01-21 completion metadata.What Changed
Completed Documentation Assets
adw-docs/dev-plans/epics/completed/E2-activity-equilibria-refactor.md- Added Completion Notes (summary, deviations, lessons learned, actual vs planned), updated Change Log, and verified the feature table now links to the completed feature docs.adw-docs/dev-plans/features/completed/E2-F1-activity-strategy-refactor.md- Marked status as Completed with dates, refreshed parent epic link to the completed path, and recorded the completion entry in the Change Log.adw-docs/dev-plans/features/completed/E2-F2-equilibria-runnable-refactor.md- Same completion/status updates plus verified parent link.adw-docs/dev-plans/features/completed/E2-F3-integration-documentation.md- Same completion/status updates plus verified parent link.Index Refresh
adw-docs/dev-plans/epics/index.md- Removed E2 from the Active table and added it to Completed to match the Completed-E1 formatting.adw-docs/dev-plans/features/index.md- Added an E2 Completed subsection with rows for E2-F1/E2-F2/E2-F3, each linking intocompleted/with the 2026-01-21 completion date; the Active section no longer references those features.Tests Added/Updated
How It Works
This phase is purely documentation cleanup: the epic and feature markdown files are now housed under
completed/, their metadata reflects the real completion date, completion notes document what was delivered, and both index tables enumerate the completed work so folks can find the final artifacts.Implementation Notes
E2-references now resolve to the completed paths. No automated link checker was run.Testing