SPH3000–6000 priority change (Grid First / Load First) via Modbus #1759
Unanswered
OliverLang123
asked this question in
Q&A
Replies: 2 comments 6 replies
|
Hi @OliverLang123 . Same question for me on the same inverter. When you say you set this on server.growatt, do you just mean by setting a schedule and enabling it, or is there a way to set the priority directly (sorry, haven't found that one). I wonder if we need to try setting the times of one of the schedules and then enabling it instead of using the inverter priority, but that doesn't seem to work - as discussed, that might need the group setting approach. |
4 replies
|
The VPP register details are in the link below. This came from the discussion The VPP code has been incorporated in the growatt plugin ready for the next releas. I hope this information helps. |
2 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Hi,
does anyone know how to change PRIORITY on SPH3000–6000 in the same way it is changed via server.growatt.com?
When using the Growatt portal, the priority clearly changes (e.g. Grid First / Load First), but we haven’t been able to reproduce the same behavior via Modbus.
Is there a specific sequence of registers, timing requirement, or hidden flag that needs to be set together with the time slots?
This was discussed here, but I somehow couldn’t find an answer.
Any hints or reverse-engineering insights would be very helpful. Thanks!