docs: record return to the selected product after sign-in A generic sign-in still opens the collection. Sign in to add returns to that product, and VIN-293 is delivered.
docs: record the delivered catalog release and braces date VIN-288 is closed. The braces exception now expires on 17 October 2026.
docs: count the signoff length after whitespace collapse The 80-character limit applies after internal spaces become one space.
docs: record the parsed Codex clean-result signoff VIN-325 accepts one short signoff instead of an exact phrase list.
docs(catalog): record the hosted development import (VIN-292) Development now has the 60-product catalog imported on 8 October 2026. Production was not changed.
docs(delivery): explain visible issue categories (VIN-321)
docs(catalog): record stable photos and stated facts (VIN-291)
docs(catalog): reconcile the server-rendered collection flow (VIN-290)
docs(catalog): record the category product contract (VIN-290)
docs: record the hosted VIN-290 category browse The development storefront serves Lighting, the product category, and an unknown slug.
docs: record VIN-287 delivery and the merged VIN-290 categories Hosted development browsing of categories is still open.
docs: record merged Codex dependency review policy (VIN-172)
docs(catalog): record VIN-289 delivery and next storefront step
docs: record roadmap refinement merge (VIN-288)
docs: link customer and technical roadmap views (VIN-288)
docs(vin-262): publish verified final demo guidance
docs: explain delivered order and payment type checks
docs: record verified accessibility and enforcement deferral
docs: record merged-main browser CI timing
docs: explain isolated browser CI and measured timing
docs: clarify pending versioned closeout (VIN-155)
docs: link verified merged restore evidence (VIN-258)
docs: explain bounded audit risk acceptance (VIN-269)
docs(recovery): record restore proof and audit blocker (VIN-258)
docs(previews): publish verified closeout (VIN-45)
docs: record merged preview checkpoint and protected final proof
docs: reconcile VIN-45 hosted checkpoint and remaining acceptance
docs: record merged VIN-45 implementation and hosted proof handoff
Record merged backlog refinement and active preview work
docs(planning): link refined backlog and delivery priorities (VIN-155)