[Board Audit] Board Health Report — 2026-03-15 #283

@github-actions

Description

@github-actions

Project: zircote/projects/1 | Repos scanned: 21 | Run: 23108738932

⚠️ Project Board API Unavailable — The GitHub Projects v2 API returned 403 Resource not accessible by integration for https://api.github.com/users/zircote/projectsV2/1. The integration token does not have project scope for user-level projects. Board column consistency checks could not be performed. The findings below are based on direct repository scans only.

Action Required: Grant the GitHub App / PAT read:project scope to enable full board auditing in future runs.


Board Summary

Board column data unavailable — cross-referencing could not be performed this run.

Column Items Changed
To Do N/A
In Progress N/A
Done N/A

Actions Taken

Action Count
Mismatched items fixed 0
Missing items identified (manual add needed) 17
Items flagged for review 5

Mismatches Fixed

None — board data inaccessible; no automated corrections applied.


Items Needing Manual Review

These items have ambiguous or notable states that warrant manual triage:

Item Repo Current Column Issue
#10 sdlc-quality Unknown SDLC audit open since 2026-01-26 (49 days), score 86/100, 2 critical violations — stale, needs resolution
#124 rlm-rs Unknown CI Failure Doctor workflow failure (2026-03-11) — unresolved, expires 2026-03-18
#16 lro-bench Unknown Daily Documentation Review failure: secret verification failed — recurring issue (also #5)
#46 adrscope Unknown Daily QA failure: no discussion categories in repo — recurring (also #27)
#84 atlatl Unknown Open Dependabot PR (rmcp 0.17→1.1.0) — major version bump, needs review

Missing Items — Candidates for Board Addition (17)

Items found open across managed repos with no known board placement. Recommended columns based on activity/assignment:

Item Repo Recommended Column Reason
#282 .github To Do CI Health Report — open automated report, unactioned
#151 .github To Do [aw] No-Op Runs tracker — infrastructure issue
#157 atlatl-spec To Do feat: user-to-curated memory linking — enhancement, no assignee
#155 atlatl-spec To Do (referenced in #157) curated memories feature
#156 atlatl-spec To Do (referenced in #157) broker feeds feature
#124 rlm-rs In Progress CI Failure Doctor failure — active, expires soon
#109 rlm-rs To Do [aw] No-Op Runs tracker — infrastructure issue
#10 sdlc-quality In Progress SDLC audit with critical violations — long open, active concern
#10 MIF To Do [aw] No-Op Runs tracker
#4 MIF To Do [agentics] No-Op Runs tracker
#16 lro-bench In Progress Daily Documentation Review failure — recurring, unresolved
#5 lro-bench To Do Earlier Daily Documentation Review failure
#46 adrscope In Progress Daily QA failure — recurring, unresolved
#84 atlatl In Progress Open PR: rmcp 0.17.0 → 1.1.0 (major)
#73 atlatl In Progress Open PR: docker/build-push-action 6→7 (7 days old)
#91 atlatl In Progress Open PR: docker/build-push-action bump — CI unstable
#92 atlatl In Progress Open PR: docker/metadata-action bump — CI unstable

Repo Scan Summary

Repo Open Issues Open PRs Notable
.github 14 (2 shown) 0 Reports & no-op trackers
github-project-manager 0 0 Clean
atlatl 0 4 2 PRs with failing CI
atlatl-spec 3 0 Feature issues, no assignees
rlm-rs 2 0 CI failure unresolved
sdlc-quality 1 0 Stale audit (49 days)
MIF 3 0 All no-op/agentic trackers
lro-bench 2 0 Recurring secret config failure
adrscope 5 2 Recurring QA failure; Dependabot PRs pending
adr 0 0 Clean
daedalus 0 0 Clean
Other 10 repos 0 0 No open items detected

Recommendations

  1. Fix project token scope — Add read:project (and write:project for auto-moves) to the GitHub App or PAT used by this workflow. This is the highest-priority fix to enable full board auditing.
  2. Resolve sdlc-quality chore(deps): bump the github-actions group with 5 updates #10 — Critical SDLC violations open 49 days with no action.
  3. Address lro-bench secret config — Daily Documentation Review has been failing since 2026-02-25 due to missing secrets.
  4. Fix adrscope discussion categories — Daily QA has been failing since 2026-02-17; enable GitHub Discussions or update workflow config.
  5. Review atlatl Dependabot PRs — PRs [Standup] Daily Standup — 2026-03-03 #91 and [agent-health] Agent Status — 2026-03-03 #92 have failing CI; PR [Alert] Smart Alerts — 2026-03-02 (Run #22589807579) #73 is 7 days old.

Generated by maintenance-board workflow — https://github.com/zircote/.github/actions/runs/23108738932

Generated by Maintenance Board ·

Metadata

Metadata

Assignees

No one assigned

    Labels

    gpm/reportGPM automated report

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests