Caribou Call — Recording · HearHear transcript
Attendees: far1no, errrks.eth, thomasg, kbmollysuh, sleety.eth
-
PT1 Fully Assembled — Ground Testing Went Well
- Caribou is fully assembled and last week's testing went well with no major problems. It is powerful and notably quiet — a small DJI hovering above it was louder; the props run at a deeper, less intrusive tone.
- Motor RPM stayed in the same range despite the batteries sitting at different charge levels.
- Two small issues: the Cube node's Ethernet adapter intermittently crashes (suspected cause: mounting too close to the antenna), and battery 6's telemetry displayed zero in Mission Planner's data window without any unhealthy-battery notification — logs to be checked to see whether it's a display issue.
- One small CBC PCB fix is wanted before anyone else orders boards; issue still to be filed.
-
First Flight Moves Into Phase 2 — Done Legally
- Julius will file for a German authority approval allowing testing at the same location for up to two years. Stated processing time is a few weeks, faster where danger is low — likely applicable (private, secured, sparsely populated field).
- Motivation stated plainly: the repo has attracted too many eyes (~75) to fly informally. Thomas agreed — more organized than the Feather PT1 days.
- Pre-flight tests that need no approval continue meanwhile: folding motor-arm connectors attached this week, another ground test with them fitted, and a battery rundown test from 100% to cutoff.
-
Phase 1 → Phase 2
- The July progress report is published. The Phase 2 document posts shortly for feedback, followed by a new Snapshot proposal with adjusted phases. Thomas remains eager to build a Texas prototype in Phase 2.
- A light website-docs status pass happens at Phase 1 close (full documentation remains later-phase scope).
- Remaining Phase 1 funds stay in the Caribou multisig until the Phase 2 Snapshot, usable for wrap-up and documentation.
- The design goes into the repo: Fusion → STEP export (Thomas offered AI-assisted help converting toward build123d). Signal cables are absent from the CAD; acceptable so long as the structure is there.
- Issues cleanup: most stale or finished issues closed.
-
PEEK Machined Parts (KBM)
- Proposal: CNC-machined PEEK (printed PEEK considered unreliable; PEEK stock is cheap) starting with the folding motor-beam mechanism, later possibly landing gear and beam joints — and eventually Quiver's center beam, top plate or attachment interface.
- KBM's recalled figures (unverified, from a supplier exhibition and test data): CF-filled PEEK approaches aviation aluminum alloy strength; pure PEEK is roughly 30–35% of aluminum's strength at about 20% of the weight. Advantage is weight; trade-off is larger part sizes unless fiber-filled.
- Agreed path: Julius models the purchased folding beam connector → KBM adjusts → KBM gets CNC quotes (China-first on cost) → compare against the bought aluminum part and metal 3D printing.
- IP note: the model is measured from a purchased Chinese part. Practical enforcement in Chinese UAV parts is near-nil, and Thomas sees a well-made machined adapter as a potential Arrow-shop product — the IP question deserves a proper look before that step.
-
Open Items
- Julius: post the Phase 2 document for feedback, then the Snapshot proposal.
- Julius: file the German site-approval application.
- Julius: check battery-6 telemetry logs; investigate the Ethernet-adapter crashes.
- Julius: folding motor-arm connectors on, ground test with them, battery rundown test.
- Julius: file the CBC PCB fix as an issue; export STEP to the repo; light website-docs status update.
- Julius: model the folding beam connector for KBM.
- KBM: adjust the model, source PEEK CNC quotes, compare costs.
-
Open Questions / Risks
- The approval timeline (weeks) now gates the first flight; no fallback was discussed.
- Battery-6 telemetry and the Ethernet crashes are open reliability items going into approval.
- PEEK strength figures need verification against datasheets before designing to them; the copy-part IP question needs a real answer before any shop product.