You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Fixed
Two field texts still described the charge counter as part of the shadow BMS, alongside a
discharge counter the blueprint no longer has. The counter is the probe that tells the blueprint
whether the inverter connection is alive: when it reports unavailable the run is stopped instead
of steering on substitute values. The section text even offered it as a field that may stay
empty, which would have dropped half of that probe without a word.
The installation step still told the reader to delete the optional package blocks. They ship
commented out, so there is nothing to delete, and cutting in that region is how a whole
utility_meter group was once lost along with the house meter next to it.