Skip to content

Fix AST fuzzer failures around network_compression_method#88048

Merged
rschu1ze merged 2 commits intoClickHouse:masterfrom
rschu1ze:fuzzer-fix
Oct 5, 2025
Merged

Fix AST fuzzer failures around network_compression_method#88048
rschu1ze merged 2 commits intoClickHouse:masterfrom
rschu1ze:fuzzer-fix

Conversation

@rschu1ze
Copy link
Copy Markdown
Member

@rschu1ze rschu1ze commented Oct 2, 2025

Follow-up to #87097

Should fix AST Fuzzer fixes like here

Changelog category (leave one):

  • Not for changelog (changelog entry is not required)

@clickhouse-gh
Copy link
Copy Markdown
Contributor

clickhouse-gh Bot commented Oct 2, 2025

Workflow [PR], commit [19c7025]

Summary:

job_name test_name status info comment
Stress test (amd_debug) failure
Server died FAIL
Hung check failed, possible deadlock found (see hung_check.log) FAIL
Killed by signal (in clickhouse-server.log) FAIL
Fatal message in clickhouse-server.log (see fatal_messages.txt) FAIL
Killed by signal (output files) FAIL
Found signal in gdb.log FAIL

@evillique evillique self-assigned this Oct 3, 2025
@clickhouse-gh clickhouse-gh Bot added the pr-not-for-changelog This PR should not be mentioned in the changelog label Oct 5, 2025
@rschu1ze rschu1ze added this pull request to the merge queue Oct 5, 2025
Merged via the queue into ClickHouse:master with commit 811b16e Oct 5, 2025
121 of 123 checks passed
@rschu1ze rschu1ze deleted the fuzzer-fix branch October 5, 2025 13:11
@robot-clickhouse-ci-2 robot-clickhouse-ci-2 added the pr-synced-to-cloud The PR is synced to the cloud repo label Oct 5, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-not-for-changelog This PR should not be mentioned in the changelog pr-synced-to-cloud The PR is synced to the cloud repo

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants