PM Insights 0.1.0
English
PM Insights 0.1.0 is the first public release of a read-only workload companion for the Obsidian Project Manager plugin.
Highlights
- Compare planned, logged, remaining, and overrun hours across multiple projects.
- Move from a team overview into each assignee's contributing tasks.
- Separate personal and shared assignments while keeping totals easy to audit.
- Filter projects, archived work, assignees, and task status from one focused view.
- Review data-quality signals for unestimated, unassigned, and excluded parent tasks.
- Keep the task column visible while horizontally scrolling detailed fields in narrow panes.
- Use the interface in English or Simplified Chinese with theme-aware styling.
Compatibility
- Obsidian 1.7.2 or later.
- The Project Manager plugin and at least one Project Manager project.
- Desktop and mobile Obsidian clients.
Privacy and data safety
PM Insights reads Project Manager metadata from the local vault. It does not modify project or task notes, and this release has no network integration or telemetry.
Read the full English release notes.
简体中文
PM Insights 0.1.0 是面向 Obsidian Project Manager 插件的只读工作量洞察工具的首个公开版本。
版本亮点
- 跨多个项目对比计划、已登记、剩余和超出工时。
- 从团队总览逐层查看每位成员及其具体任务构成。
- 区分个人任务与共享任务,同时让汇总结果保持清晰、易于核对。
- 在同一视图中筛选项目、归档内容、成员和任务状态。
- 展示未估算、未分配以及被排除父任务等数据质量提示。
- 在狭窄侧边栏中固定任务列,并允许横向滚动查看其他详细字段。
- 支持英文和简体中文界面,并适配 Obsidian 主题样式。
兼容性
- Obsidian 1.7.2 或更高版本。
- 已安装 Project Manager 插件,并至少存在一个 Project Manager 项目。
- 支持 Obsidian 桌面端与移动端。
隐私与数据安全
PM Insights 仅从本地 Vault 读取 Project Manager 元数据,不会修改项目或任务笔记;本版本不包含网络集成或遥测。
查看完整的中文发布说明。