Skip to content

feat(stage3): canonical control-plane local implementation batch (WL3-000..820) - #33

Open
DTALEX66 wants to merge 1 commit into
mainfrom
stage3/control-plane-20260808
Open

feat(stage3): canonical control-plane local implementation batch (WL3-000..820)#33
DTALEX66 wants to merge 1 commit into
mainfrom
stage3/control-plane-20260808

Conversation

@DTALEX66

@DTALEX66 DTALEX66 commented Aug 9, 2026

Copy link
Copy Markdown
Owner

Stage 3 交接提交

实现 WORK-LAB Stage 3 canonical taskpack 的本地、可逆工作。

内容

  • WL3-000 基线:STAGE3_BASELINE.json(head a3a6fa6)、CURRENT_STATE 重新生成、Stage 3 任务图
  • WL3-010 范围收口:移除 Open Design/MINIGAME CI 残留(design-contract/production-evidence/standard-validators/三分支 pilot),新增 Stage 3 测试
  • WL3-100/110/120 平台实例唯一性:identity resolver、instance reconciler、controlled repro
  • WL3-200/210/220 配置所有权:config ownership + coordinator + codex-assets 同步
  • WL3-400/410/420 本地控制面:sidecar + 单实例锁、telemetry ledger、project profiles
  • WL3-500/600 Observer 只读权威投影(schema v2)+ web SSE-ready

验证

  • run_quality_gate.py verifyQUALITY_GATE_PASS(20 gates)
  • 11 个 workflow Stage3 测试 OK
  • observer Python 9 + Node 45 OK
  • baseline 2 OK

未授权项(pending,诚实标注)

  • live/global config apply、双入口卸载/迁移、Windows portable build(无 Rust/Tauri toolchain)、付费 smoke、外部项目 canary、历史减重——均未执行。

边界

无凭据、无 E:、Observer 只读、无历史重写。

…-000..820)

Implements the WORK-LAB Stage 3 canonical taskpack's local, reversible work:
- WL3-000: STAGE3_BASELINE.json (real head a3a6fa6, dirty classified, writer unique),
  regenerated CURRENT_STATE (f141946->a3a6fa6), Stage 3 task graph
- WL3-010: remove Open Design/MINIGAME CI residuals (design-contract,
  production-evidence, standard-validators, 3-branch pilot); add Stage 3 tests
- WL3-100/110/120: platform identity resolver, instance reconciler, controlled repro
- WL3-200/210/220: config ownership + coordinator + codex-assets sync
- WL3-400/410/420: local sidecar + single-instance lock, telemetry ledger,
  project profiles, observer projection adapter
- WL3-500/600: Observer read-only authority projection (schema v2), web SSE-ready
- Stage 3 handoff summary

Verified: QUALITY_GATE_PASS (20 gates), 11 workflow Stage3 tests OK,
observer Python 9 + Node 45 OK, baseline 2 OK. No credentials, no E:, read-only
Observer, no history rewrite. Publish/live/destructive items remain pending.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant