Workflow: Release Readiness

Pre-release checklist + rollout playbook. Runs as Stage 11 of Workflow PRD to Production, after validation has passed.

For the canonical version, see workflows/release-readiness.md.

Entry conditions

  • Validation report has Status: PASS (see Workflow Testing and Validation).
  • Staging environment runs the release candidate stably for the duration specified in the PRD.
  • No active P0 / P1 incidents.

Pre-release checklist

[ ] Validation report attached to the PRD
[ ] Staging environment stable for >= duration specified in PRD
[ ] Performance budgets met in staging load tests
[ ] Rollback procedure drilled and confirmed working
[ ] Feature flag wired and tested (on / off)
[ ] Observability dashboards updated
[ ] Alerts configured for the new feature's failure modes
[ ] Documentation merged (PRD Section 12)
[ ] Changelog / release notes drafted
[ ] On-call team briefed on the new surface
[ ] Customer comms drafted (if user-visible change)
[ ] Compliance / privacy sign-off (if required by feature scope)
[ ] No active P0/P1 incidents
[ ] Deployment owner identified

Every box must be checked. Skipping a box and adding "we'll handle it after deploy" is the failure mode this checklist exists to prevent.

Rollout strategy

PRD Section 19 defines the strategy. Common shapes:

Feature-flag gradual rollout (recommended default)

  • 10% of traffic for 24 hours; monitor.
  • 50% of traffic for 24 hours; monitor.
  • 100% of traffic; monitor for 7 days.

At each stage:

  • Monitor: error rate, latency p95/p99, success metrics from PRD Section 3.3.
  • Trigger rollback if any metric breaches the threshold in PRD Section 19.1.

Canary deploy (when feature flag is impractical)

  • Deploy to one region or one cluster first.
  • Monitor.
  • Promote to remaining regions.

Big-bang (only for low-risk changes)

  • Deploy everywhere at once.
  • Only appropriate when blast radius is minimal and rollback is fast.

For most features, gradual rollout is the default. Big-bang requires explicit ADR.

Per-stage gates

Stage 11a: 10% rollout

  • Traffic shift confirmed in load balancer / feature flag.
  • Error rate within baseline + 0.1%.
  • p95 latency within budget.
  • Alerts not firing.
  • Customer impact: zero P0/P1 reports related to the feature.

If all green for 24 hours, advance. Otherwise rollback.

Stage 11b: 50% rollout

  • Same metrics as 11a with higher floor.
  • Cache hit rates stabilizing as expected.
  • Database load within projected envelope.

If all green for 24 hours, advance. Otherwise rollback.

Stage 11c: 100% rollout

  • Full traffic.
  • Monitor for 7 days.
  • Compare success metrics (PRD Section 3.3) against targets.

If success metrics within target after 7 days, declare release complete. Otherwise: investigate gap, fix, re-validate.

Rollback triggers (mechanical)

Per PRD Section 19.1:

  • p95 latency > <threshold> sustained for 5 minutes.
  • Error rate > <threshold> sustained for 5 minutes.
  • Customer-reported correctness regression with reproduction.

Triggers are mechanical. The on-call engineer doesn't deliberate — if a trigger fires, rollback is the response.

Rollback procedure

Per PRD Section 19.2:

  1. Toggle feature flag to off (or revert deploy if no flag).
  2. Verify error rates drop to baseline within 1 minute.
  3. Open an incident ticket.
  4. Investigate root cause.
  5. Fix and re-validate before re-attempting rollout.

Post-rollout (after 100% stable for 7 days)

  • Update PRD status to Shipped. Move from prds/active/ to prds/archive/.
  • Update spec triplet status to Complete.
  • Capture lessons learned in a brief retrospective. The prd-author agent can draft a starting outline.
  • Identify follow-ups. Anything explicitly out of scope (PRD Section 4.2) that's now worth doing → new PRD.

Communication

Milestone Notify
10% rollout begins Engineering team, product owner
50% rollout begins Engineering team
100% rollout begins Engineering team, product owner, support
100% stable for 7 days Engineering team, product owner, support, customers (if user-visible)
Rollback triggered All of the above + on-call escalation

Comms templates are project-specific. Drafting is part of release readiness; ad-hoc comms during incidents are noisy.

Anti-patterns

  • Skipping the rollback drill. Untested rollback is no rollback.
  • Big-bang for non-trivial changes. Saves a day; costs a week if it goes wrong.
  • Skipping the 7-day soak at 100%. Some failure modes only surface at steady-state full traffic.
  • Closing the PRD before metrics are validated. Premature closure leaves the PRD claim ("time-to-find < 2s") unverified.
  • No on-call briefing. On-call gets paged at 3am for a feature they've never seen.