Sprint and Scrum Logs

Bloodknight edited this page Apr 29, 2017 · 14 revisions

Project Members

Katriona Angel, Adam Ashford, Marc Chapman, David Calloway, Dary Conway, Chelsey Cox, Ryan Wooton.

Project Overview (Editor: Kat)

  • Research into projects carried out; rapidjson selected.
  • Roles set – programmers: Marc and Kat, testers: Adam, David and Daryl, designers: Chelsey and Ryan. 1st sprint scrum master: Kat.
  • Sprint sessions – 2 hours Monday 9-11am, 2 hours Tues/Weds ad-hoc.
  • Tools set up – Slack for out of hours’ communications and Trello for recording stories.
  • Rough burn chart created. Story point system 100 points = approx. 1 hour worth of work. Story points assigned to issues on Trello.
  • Sprints – 1 week long, can extend to 2 weeks in case of schedule slip. 6x1 week sprints or 3x2 week sprints.

(extended edit: Marc)
It was discussed briefly, that since the group entered into the project at a midpoint (Established and fully functional product, with bugs and extensibility requests as github issues) it would be best if issues were selected that could be started on by all role-groups (design, test, dev). These should merge into correct workflow from Iteration 2-3 so that the process flow passes from one roe to the next as expected.

Scrum Master

  • Week 1 - Kat
  • Week 2 - Marc
  • Week 3 - Ryan
  • Week 4 -
  • Week 5 -
  • Week 6 -

Sprint 1 [20.03.2017] (SM: Kat)

Daily Scrum 1 (Editor: Marc)

This session was used for sprint overview (Issue selection and organisation)

Daily Scrum 2 (Editor: Kat)

  • Programmers – issues 849 and any other progress on issues selected for this sprint.
  • Testers – testing story for 849 and other rapidjson issues.
  • Designers – UML and use cases for listed enhancements within the system.
  • Current blockers – understanding the code, understanding role requirements. Discuss overlapping roles with John Murray in future/via email?
  • Carry on work on assigned issues outside of class. Converse with ‘partners’ via Slack and update story points/issue cards on Trello. Report completed issues so the burndown chart can be updated.

Sprint 1 Review (Editor: )


Sprint 2 [27.03.2017] (SM: Marc)

Daily Scrum 1 (Editor: Marc)

  • Programmers
    • Done: Issue #849.
    • Todo: Issues #798 #825 #852
  • Testers
    • Done: Test Case for #849.
    • Todo: Test Fix for #849.
  • Designers
    • Done: #810, #671.
    • Todo #836.
  • Blocks
    • Ongoing unfamiliarity with a complex codebase.
    • No specified Product Owner.
    • Testers are currently uncoordinated
    • Lack of current iteration markers in trello.

Daily Scrum 2 (Editor: Marc)

  • Programmers
    • Done: ( ).
    • Todo: Issues #798 #825 #852
  • Testers
    • Done: Test Fix for #849.
    • Todo: Test Cases for #798, #825, #852
  • Designers
    • Done: ( ).
    • Todo #836.
  • Blocks
    • Ongoing unfamiliarity with a complex codebase.
  • Blocks Fixed
    • No specified Product Owner
      (Marc has arbitrarily taken ownership until objections are logged)
    • Testers are currently uncoordinated
      (In an attempt to stop Daryl stealing all the work for himself, he has been given delegation responsibilities by the current overlord)
    • Lack of current iteration markers in trello.
      (Fixed, also better trello working practice improved overall workflow understanding cross team)

Sprint 2 Review (Editor: )


Sprint 3 [03.04.2017] (SM: Ryan)

Daily Scrum 3 (Editor: Ryan)

NOTE: Internet access was down during the day of the sprint, severely hindering progress, also one of the testers (David) was absent due to health issues.

Designers:

What has been done: Completed task given last week and uploaded the designs. What is being done today: Look at tasks that needs doing and assign tasks to each other, create UML graphs. What is to be done during the week: Continue with the above.

Programmers:

What has been done: Issue #798 shelved due to potential complexity of a fix. Issue #917 fixed and documented on issue page on GitHub. What is being done today: Re-reading the code to better understand it, continue with working on solutions for other tasks. What is to be done during the week: Continue working on other tasks, if the task is completed begin work on a new task.

Testers:

What has been done: Everything they were tasked with doing. What is being done today: Nothing, as the aforementioned lack of internet access means they cannot access the program to formulate tests. What is to be done during the week: Additional review work to account for the work that could not be done today.

Daily Scrum 4 (Editor: Ryan)

Sprint 3 Review (Editor: )


Sprint 4 [10.04.2017] (SM: )

Daily Scrum 5 (Editor: )

Daily Scrum 6 (Editor: )

Sprint 4 Review (Editor: )


Sprint 5 [17.04.2017] (SM: )

Daily Scrum 7 (Editor: )

Daily Scrum 8 (Editor: )

Sprint 5 Review (Editor: )


Sprint 6 [24.04.2017] (SM: )

Daily Scrum 9 (Editor: )

Daily Scrum 10 (Editor: )

Sprint 6 Review (Editor: )