Parent roadmap: #127
Goal
Build the post-v1 advanced contribution operating layer after phases 0-5 are stable: replayable decisions, repo-specific scenario planning, MCP-native workflows, custom agent distribution, policy compilation, and outcome learning.
This phase should make Gittensory feel much more useful without turning it into the wrong product. It is still a deterministic control plane for contribution work, not a reward predictor or autonomous PR bot.
Non-goals
- No public reward predictor.
- No public leaderboard.
- No wallet, hotkey, or coldkey dashboard.
- No autonomous PR bot.
- No public raw trust score, private reviewability, or private scoreability output.
Research basis
Phase 6 child epics
Related cross-phase dependencies
These are native children of earlier phase epics, but they support the advanced operating layer once those phases are stable:
Done when
- The phase owns advanced post-v1 work without creating another top-level roadmap.
- Implementation work is split into focused child issues that fit one contributor PR each.
- Advanced planning remains advisory and authenticated where needed.
- Public GitHub surfaces stay sanitized and low-noise.
- Implementation PRs include targeted tests plus npm run test:ci.
Cross-cutting acceptance criteria
- Public output must not expose wallets, hotkeys, reward estimates, raw trust scores, public score predictions, private reviewability, private scoreability, or farming language.
- MCP/local tooling must keep source-upload behavior fail-closed.
- Scenario and outcome systems must not claim guaranteed payout outcomes.
- Human approval remains required for issue filing, PR creation, comments, labels, closure, merge, and public GitHub actions unless a separate maintainer-approved policy explicitly allows a narrow action.
Parent roadmap: #127
Goal
Build the post-v1 advanced contribution operating layer after phases 0-5 are stable: replayable decisions, repo-specific scenario planning, MCP-native workflows, custom agent distribution, policy compilation, and outcome learning.
This phase should make Gittensory feel much more useful without turning it into the wrong product. It is still a deterministic control plane for contribution work, not a reward predictor or autonomous PR bot.
Non-goals
Research basis
Phase 6 child epics
Related cross-phase dependencies
These are native children of earlier phase epics, but they support the advanced operating layer once those phases are stable:
Done when
Cross-cutting acceptance criteria