docs: triage ECC upstream commits e9c8845..393d397#74
Conversation
Audit log for round 3. 67 commits in the focused range. Two ports (code-reviewer guardrails, prompt defense baselines), eight deferred net-new features, fifty-seven skipped with rationale. Net-new feature additions in this round (deferred): - PRD planning command flow - network architect agents - motion system skills - Quarkus handling - Django Celery workflow - cost tracking + skill scout - frontend design guidance - homelab config skills (VLAN, Pi-hole, WireGuard) Follow-up PRs: 1. port: code-reviewer guardrails + prompt defense baselines 2. docs: sync upstream baseline to 393d397 Doc-only. 279/279 tests pass.
|
No actionable comments were generated in the recent review. 🎉 ℹ️ Recent review info⚙️ Run configurationConfiguration used: Path: .coderabbit.yaml Review profile: ASSERTIVE Plan: Pro Run ID: 📒 Files selected for processing (1)
WalkthroughThis PR adds Changes2026-05-13 Upstream Sync Inventory
🎯 1 (Trivial) | ⏱️ ~3 minutes Possibly related PRs
Suggested labels
🚥 Pre-merge checks | ✅ 5✅ Passed checks (5 passed)
✏️ Tip: You can configure your own custom pre-merge checks in the settings. ✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
Summary
Round 3 audit log. ECC moved 67 commits forward of the baseline recorded at the end of round 2 (#71 reported 65 when the drift tracker opened; ECC merged 2 more before triage).
Round 3 totals
Notable findings
df60af9(code-reviewer guardrails) — adds Pre-Report Gate, HIGH/CRITICAL proof rules, "zero findings is valid" guidance, and a Common False Positives catalog to ECC's code-reviewer agent. All harness-agnostic. Port target.393d397(prompt defense baselines) — adds a uniform 6-bullet prompt-defense block to ECC'sCLAUDE.mdand every agent file (71 files total upstream). Port target — apply to EGC'sGEMINI.mdand all agents.Deferred (8 net-new features)
ECC added meaningful new surfaces this round that exceed a sync-round port scope: PRD planning command, network architect agents, motion system skills, Quarkus handling, Django Celery workflow, cost tracking + skill scout, frontend design guidance, homelab config skills. These join the deferred net-new candidates from round 2 (
tinystruct-patterns,ios-icon-gen,flox-environments) — should be opened as a dedicated "ECC net-new" PR set in a future round.Follow-up PRs
Test plan
Summary by cubic
Adds the 2026-05-13 upstream sync inventory documenting ECC drift (67 commits from
e9c8845to393d397). It calls out two port targets (code-reviewer guardrails and prompt-defense baselines), defers eight net-new features, and marks 57 skips to guide follow-ups.Written for commit 925b1c8. Summary will update on new commits.
Summary by CodeRabbit