Repository navigation
·
3 commits
to main
since this release
Added
/readysplits the ready set into subgroups: by dev out of the box, or by milestone, tier or nothing (gcycles).sasks which subgroups lead, as a comma-separated list; the rest follow in natural order (devs alphabetically with the unassigned last, milestones by number, tiers lowest first). Both settings live in the plugin's store on each dev's own machine, never in the roadmap.
Changed
/readydraws every ready task and scrolls when the list outgrows the pane, in place of the first nine and amore below the foldline. The first nine rows still take a digit; Tab reaches the rest. The digits follow the drawn order, so the subgroups a person puts first take1upwards.- The
Ready nowandIn playheadings draw at full strength; only the rule either side is dim.
Fixed
- The subgroup order field now matches tier names, and closes once a row is picked.