v2.4.0 - 3rd stage of HB electrification + SM-FF/CME/IME line
This update completes E-yard in HB and fills a missing link between SM and the northern part of the system.
Installation
- Install Unity Mod Manager (UMM),
- Install Custom Car Loader (CCL) and its prerequisites,
- Uninstall the following mods in UMM, if they're present: WE6-981 and WE6SIM,
- Drag and drop both Catenary-DC.zip and 2WE3CCL.zip into UMM.
The first file contains simulation code and catenary, the second is locomotive model itself. Both are required. - It's strongly recommended to read the operating manual. The control scheme and operation of the locomotive are different from vanilla diesel and battery electric.
Usage and spawning
The locomotive is currently set to appear at HB, FF, SM, IME and CME. The parking sidings at SM and FF and the roundhouse at HB are unelectrified, so using another locomotive or the jogging mode is required there.
Electricity price in career is set to $10/kWh by default. It can be changed in mod options.
When spawning the locomotive in sandbox via the radio, make sure that units A and B are facing in the same direction and the arrow "front" of unit B is touching the arrows "back" of unit A. The order in which units are spawned doesn't matter: it's possible to bring in unit B first, then A and vice versa.
The debug version Catenary-DC-debug.zip includes an infinite power cheat, toggleable in mod settings. When enabled it allows the locomotive to run anywhere on the map. However it doesn't disable electricity costs.
Other limitations
This mod is incompatible with VR and multiplayer, as the author doesn't have means to do proper tests in either. It also won't work properly with Double-Tracked Valley, as double tracked mainlines have to be redone manually.
The height of the locomotive causes it to clip through water standpipes and chutes at SM and IME. The collision with them is not enforced and players are free to ignore these.
The catenary has no hitboxes to both help with performance and permit players to throw switches obscured by poles via radio.
Gadgets which directly control a locomotive, such as amp limiter or overheat protector, are not compatible. Neither is "Start-up" function of the comms radio.
An installed inclinometer gadget shows 1-2° lean forward on a level track.
Some details, like physical horns, sand pipes, bogie centering devices and underframe air ducts, are missing.
Whistle lever can only be operated with a mouse.
For debugging purposes pantograph wear is tracked separately as a "mechanical powertrain". It'll be merged into electrical later.
Included files
- Catenary-DC.zip - contains catenary and simulation code. Do not install together with Catenary-DC-debug.zip,
- Catenary-DC-debug.zip - debug version with logging and omnipresent power cheat. Do not install together with Catenary-DC.zip,
- 2WE3CCL.zip - locomotive model,
- 2WE3_manual.pdf - operating manual.