POM Case study code

This code is set in place to aid in solving the variious numerical and computation heavy processes in solving the POM workshop tasks

to run most of the files you will need

A working python installation

The following libraries

run: pip install networkx matplotlib requests numpy osmnx geopy pandas

For most of the files you may just need to run them but some such as the shelf utilizatoin require some parameters inorder to run

Documentation for Case study 1 on shelf utilization

Documentation: CaseStud1_No1_Shelf_Util.py

Overview

This Python module simulates a production planning system for managing shelf allocation across three plants (A, B, and C) over a 5-year planning period (2026-2030). It calculates optimal shelf distribution based on production requirements, yields, and workforce needs.

Purpose

The utility helps decision-makers understand:

  • How many shelves each plant requires based on projected sales
  • Profit/loss margins relative to production targets
  • Workforce requirements (workers, technicians, and team leaders)

Key Data Structures

Production Yield Per Shelf

data_yield = [
    ["A", 0.5],  # Plant A yields 0.5 tons per shelf
    ["B", 0.3],  # Plant B yields 0.3 tons per shelf
    ["C", 0.4],  # Plant C yields 0.4 tons per shelf
]

Projected Sales Data

The module contains three arrays representing sales projections for each plant across 5 years:

  • plant_a: [1.5, 1.1, 0.8, 0.5, 0.0] tons per year
  • plant_b: [0.0, 0.1, 0.3, 0.5, 0.6] tons per year
  • plant_c: [0.6, 1.2, 0.6, 1.2, 0.6] tons per year

Main Functions

calcShelvesForAYear(pro_year, yield_p_shelf)

Calculates the minimum number of shelves required to meet production for a single plant.

  • Input: Production target (pro_year) and yield per shelf
  • Output: Number of shelves needed (rounded up using ceil)
  • Formula: shelves = ⌈production / yield_per_shelf⌉

calcProjectedShelvesSize(idx)

Determines the ideal shelf allocation for all three plants for a given year.

  • Input: Year index (0-4, where 0 = 2026)
  • Output: List [shelves_A, shelves_B, shelves_C]
  • Purpose: Shows what the optimal shelf distribution should be

calcYields(value)

Calculates actual production yield based on shelf allocation.

  • Input: List of shelves allocated [shelvesA, shelvesB, shelvesC]
  • Output: Actual yields produced [yieldA, yieldB, yieldC]
  • Calculation: yield = shelves × yield_per_shelf

calcProfitsAndLosses(value, idx)

Compares actual production to projected targets, calculating profit/loss margins.

  • Input: Shelf allocation and year index
  • Output: Profit/loss for each plant [pl_A, pl_B, pl_C]
  • Calculation: profit_loss = (actual_yield) - (projected_sales)

calcWorkers(value)

Determines workforce requirements based on shelf allocation.

  • Input: List of shelves allocated [shelvesA, shelvesB, shelvesC]
  • Output: Workers breakdown per plant [[workers, technicians, leaders], ...]
  • Staffing Rules:
    • Base: 3 technicians per plant
    • Team Leaders: 1 per shelf (+ oversight)
    • Production Workers: 1 worker per 0.1 tons of yield (⌈yield / 0.1⌉)
    • Additional Technician: 1 more per plant if shelves > 0

main(shelfA, shelfB, shelfC, year)

Main execution function that orchestrates calculations and records results.

  • Input: Shelf counts for each plant and year (command-line arguments)
  • Process:
    1. Validates input shelf counts
    2. Calculates profits/losses for the given year
    3. Computes required workforce
    4. Writes results to records.txt
  • Output: Records file with shelves, profit/loss, and workforce data

Usage

Run from command line with four arguments:

python CaseStud1_No1_Shelf_Util.py <shelfA> <shelfB> <shelfC> <year>

Example:

python CaseStud1_No1_Shelf_Util.py 3 0 2 0

This allocates 3 shelves to Plant A, 0 to Plant B, 2 to Plant C for year 2026 (index 0).

Output

Results are appended to records.txt in the following format:

  • Shelf allocation for each plant
  • Profit/loss margins relative to projected sales
  • Workforce requirements (workers, technicians, leaders) per plant

Key Variables

Variable Type Purpose
years List Year labels (2026-2030)
plant_a/b/c List Projected sales per year (tons)
year_shelves List Stores calculated shelf requirements (declared but unused)
year_profits_losses List Stores profit/loss data (declared but unused)

Notes

  • The module uses functional programming with reduce() to sum shelf counts
  • Ceiling function ensures adequate shelf allocation to meet all targets
  • Worker calculations account for management overhead (team leaders) plus production workers
  • Results are accumulated in records.txt (append mode), preserving historical calculations

NPV.py - Net Present Value Analysis

Overview

This module performs financial analysis comparing two investment strategies for facility acquisition: building ownership versus renting. It calculates Net Present Value (NPV) for a 5-year investment period (2026-2030) to determine which option is more financially viable.

Purpose

The utility helps determine:

  • Whether it's more cost-effective to buy and maintain a building or rent
  • Expected cash flows based on projected sales
  • Net profit/loss after discounting future cash flows
  • Impact of residual asset values at the end of the investment period

Key Financial Data

Investment Costs

Buying (One-time and recurring costs):

buying = {
    "buildingCosts": 1.5,    # Building construction: $1.5M
    "land_costs": 0.5,       # Land acquisition: $0.5M
    "equipment": 3,          # Equipment: $3M
}

Total Initial Investment for Buying: $5M

Renting:

renting = {
    "buildingLand": 40000    # Annual rent: $40,000
}

Product Costs and Pricing

Three product lines (D, E, F) with associated costs and selling prices:

Consumables Cost (Manufacturing cost per unit):

  • D: $5,000
  • E: $6,000
  • F: $4,500

Sales Price:

  • D: $7,500
  • E: $8,000
  • F: $6,000

Gross Profit Per Unit:

  • D: $2,500
  • E: $2,000
  • F: $1,500

Sales Projections (2026-2030)

projectedAnnualSales = {
    "2026": 0.1,   # 100,000 units
    "2027": 0.3,   # 300,000 units
    "2028": 0.8,   # 800,000 units
    "2029": 1.0,   # 1,000,000 units
    "2030": 1.3,   # 1,300,000 units
}

Financial Parameters

  • Discount Rate: 0.1 (10% annual compounded monthly)
  • Maintenance as % of Initial Investment: 15% yearly
  • Residual Land Value: 80% of original cost (recoverable at end of period)
  • Residual Building Value: 0% (fully depreciated)

Core Functions

calcSumBuilding()

Calculates total initial investment for building purchase.

  • Output: Sum of building costs, land costs, and equipment ($5.0M)
  • Purpose: Baseline for NPV calculation in purchase scenario

calcSumRenting()

Calculates total rent-related costs over 5 years.

  • Calculation: (40000 / 10^6) × 5 + 3 = $3.0M
  • Purpose: Baseline for NPV calculation in rental scenario

calcNetSalesPerYear()

Calculates gross profit per product line (selling price minus cost).

  • Output: Dictionary with net sales per product {D: 2500, E: 2000, F: 1500}
  • Purpose: Used to determine per-unit profitability

calcTotalNetSales()

Sums total gross profit across all three product lines.

  • Output: 2500 + 2000 + 1500 = $6,000 per unit
  • Purpose: Total revenue per unit sold

calcCashFlows()

Calculates annual cash flows normalized to millions.

  • Process:
    1. Gets total net sales per unit
    2. Multiplies by annual sales projection
    3. Divides by 10^6 to normalize to millions
  • Output: Dictionary with cash flows for each year (millions)
  • Example: Year 2026: $6,000 × 0.1 / 10^6 = $0.0006M

calcNPVBuilding(maintainYearly=False)

Calculates NPV for building purchase option.

  • Parameters:
    • maintainYearly: If True, maintenance subtracted yearly; if False, deducted upfront
  • Process:
    1. Subtracts initial investment ($5M)
    2. Applies maintenance costs (15% of initial investment = $0.75M/year)
    3. Discounts cash flows: CF / (1 + discount_rate)^year
    4. Adds back residual land value (80% of $0.5M = $0.4M)
  • Output: NPV value in millions
  • Formula: NPV = -Initial + Σ(CashFlow / (1.1)^year) - MaintenanceCosts + ResidualValue

calcNPVRenting()

Calculates NPV for renting option.

  • Process:
    1. Subtracts initial rental setup costs ($3M)
    2. Applies 15% maintenance yearly
    3. Discounts cash flows over 5 years
  • Output: NPV value in millions
  • Key Difference: No residual value recovery at end of period (rented asset)

Usage

Run directly as a script:

python NPV.py

Output

The script generates NPV calculations and appends them to records.txt:

Net Sales per Product: {D: 2500, E: 2000, F: 1500}
Annual Cash Flows (millions): [0.0006, 0.0018, 0.0048, 0.006, 0.0078]

Building NPV yearly maintenance: <value>
Building NPV initial: <value>
Building NPV renting: <value>

Interpretation

Decision Rule:

  • Compare the three NPV values
  • Positive NPV = Value-creating investment
  • Highest NPV = Most financially attractive option
  • Typically: Buying with residual value recovery > Renting > Buying with upfront maintenance

Key Variables Summary

Variable Type Purpose
buying Dict One-time construction/equipment costs
renting Dict Annual rental expenses
consumablesCost Dict Manufacturing cost per product
salesPrice Dict Selling price per product
projectedAnnualSales Dict Sales volume by year (millions)
COMPOUDED_MONTHLY_DISCOUNT_RATE Float 10% annual discount rate
RESIDUAL_VALUE_LAND Float 80% of land cost recovered
RESIDUAL_VALUE_BUILDING Float 0% depreciation (fully used)

Financial Concepts Used

  • Net Present Value (NPV): Present value of all future cash flows minus initial investment
  • Discounting: Adjusting future cash flows to present value using discount rate
  • Maintenance Costs: Operating expenses estimated at 15% of initial investment annually
  • Residual Value: Salvage value of assets at end of investment period

Notes

  • Discount rate (10%) is applied annually using the formula: CF / (1 + rate)^year
  • Calculations assume all cash flows occur at year-end
  • The module uses functional programming with reduce() for aggregations
  • Results are appended to records.txt preserving all historical analyses
  • The comparison helps decision-makers choose between capital-intensive (buying) vs. operational-intensive (renting) strategies

Documentation for case study 3 No4

Below is the mathematical formulation of what your code is doing, followed by a step-by-step explanation that maps directly to each line of the function.

1. Mathematical Equation Used (Normal Distribution)

Your code is plotting the probability density function (PDF) of a normal (Gaussian) distribution:

$$f(x) = \frac{1}{\sigma \sqrt{2\pi}} \exp\left(-\frac{1}{2}\left(\frac{x - \mu}{\sigma}\right)^2\right)$$

Correspondence to Your Code

Mathematical Symbol Code Variable
$\mu$ (mean) mean
$\sigma$ (population standard deviation) std_dev
$x$ x
$f(x)$ y

2. How the Bell Curve Is Constructed (Step by Step)

Step 1: Input Data

shelf is a list of numerical observations, for example monthly yields from a shelf:

$${x_1, x_2, \ldots, x_n}$$


Step 2: Compute the Mean

mean = calcMean(values)

$$\mu = \frac{1}{n} \sum_{i=1}^{n} x_i$$

The mean determines the center of the bell curve.


Step 3: Compute the Population Standard Deviation

std_dev = calcPopStandardDeviation(values)

$$\sigma = \sqrt{\frac{1}{n} \sum_{i=1}^{n} (x_i - \mu)^2}$$

The standard deviation controls the spread (width) of the curve.


Step 4: Define the x-Range (±3σ Rule)

x = np.linspace(mean - 3*std_dev, mean + 3*std_dev, 100)

Mathematically:

$$x \in [\mu - 3\sigma,\ \mu + 3\sigma]$$

This interval is chosen because:

  • ~68% of data lies within $\pm 1\sigma$
  • ~95% within $\pm 2\sigma$
  • ~99.7% within $\pm 3\sigma$

Thus, nearly the entire distribution is captured.


Step 5: Compute the Bell Curve Values

y = (1/(std_dev * np.sqrt(2 * np.pi))) * np.exp(-0.5 * ((x - mean) / std_dev) ** 2)

This evaluates:

$$y = f(x) = \frac{1}{\sigma \sqrt{2\pi}} \exp\left(-\frac{1}{2}\left(\frac{x - \mu}{\sigma}\right)^2\right)$$

For each point $x$, the formula computes the height of the bell curve.


Step 6: Plot the Curve

plt.plot(x, y)

This produces the smooth bell-shaped curve centered at $\mu$, with width determined by $\sigma$.


3. Interpretation of the Bell Curve

  • The curve is not a histogram of your data
  • It is a theoretical normal distribution fitted using:
    • empirical mean
    • empirical population standard deviation

The area under the curve equals 1, meaning it represents a probability density.


4. Intuition

  • Higher $\sigma$ → wider, flatter curve
  • Lower $\sigma$ → narrower, taller curve
  • Shifting $\mu$ → moves the curve left or right

Your data determine only two parameters ($\mu, \sigma$), and the bell curve is then fully defined.


5. Important Note

You are using the population standard deviation, which assumes the shelf data represents the full population. If the shelf values are a sample, the sample standard deviation should be used instead.


If you want, I can also:

  • Overlay this curve on a histogram of the shelf data
  • Explain when the normal assumption is justified
  • Show how to test normality (Shapiro–Wilk, Q-Q plot)

Just tell me.

1. Mathematical Equation Used (Normal Distribution)

Your code is plotting the probability density function (PDF) of a normal (Gaussian) distribution:

$$ f(x) = \frac{1}{\sigma \sqrt{2\pi}} \exp!\left(-\frac{1}{2}\left(\frac{x - \mu}{\sigma}\right)^2\right) $$

Correspondence to Your Code

Mathematical Symbol Code Variable
( \mu ) (mean) mean
( \sigma ) (population standard deviation) std_dev
( x ) x
( f(x) ) y

2. How the Bell Curve Is Constructed (Step by Step)

Step 1: Input Data

shelf is a list of numerical observations, for example monthly yields from a shelf.

$$ {x_1, x_2, \ldots, x_n} $$


Step 2: Compute the Mean

mean = calcMean(values)

$$ \mu = \frac{1}{n} \sum_{i=1}^{n} x_i $$

The mean determines the center of the bell curve.


Step 3: Compute the Population Standard Deviation

std_dev = calcPopStandardDeviation(values)

$$ \sigma = \sqrt{\frac{1}{n} \sum_{i=1}^{n} (x_i - \mu)^2} $$

The standard deviation controls the spread (width) of the curve.


Step 4: Define the x-Range (±3σ Rule)

x = np.linspace(mean - 3*std_dev, mean + 3*std_dev, 100)

Mathematically:

$$ x \in [\mu - 3\sigma,\ \mu + 3\sigma] $$

This interval is chosen because:

  • ~68% of data lies within ( \pm 1\sigma )
  • ~95% within ( \pm 2\sigma )
  • ~99.7% within ( \pm 3\sigma )

Thus, nearly the entire distribution is captured.


Step 5: Compute the Bell Curve Values

y = (1/(std_dev * np.sqrt(2 * np.pi))) * np.exp(-0.5 * ((x - mean) / std_dev) ** 2)

This evaluates:

$$ y = f(x) = \frac{1}{\sigma \sqrt{2\pi}} \exp!\left(-\frac{1}{2}\left(\frac{x - \mu}{\sigma}\right)^2\right) $$

For each point ( x ), the formula computes the height of the bell curve.


Step 6: Plot the Curve

plt.plot(x, y)

This produces the smooth bell-shaped curve centered at ( \mu ), with width determined by ( \sigma ).


3. Interpretation of the Bell Curve

  • The curve is not a histogram of your data

  • It is a theoretical normal distribution fitted using:

    • empirical mean
    • empirical population standard deviation

The area under the curve equals 1, meaning it represents a probability density.


4. Intuition

  • Higher ( $\sigma$ ) → wider, flatter curve
  • Lower ( $\sigma$) → narrower, taller curve
  • Shifting ( $\mu$ ) → moves the curve left or right

Your data determine only two parameters (( $\mu, \sigma$ )), and the bell curve is then fully defined.


5. Important Note

You are using the population standard deviation, which assumes the shelf data represents the full population. If the shelf values are a sample, the sample standard deviation should be used instead.